Laserfiche WebLink
Maintenance Data Ozone Sparge System-Operations and Maintenance STTC-East System <br /> Field Data Sheet 2526 West Washington Street <br /> Stockton,California <br /> frequency Item to Inspect or Maintain Date Performed <br /> Monthly to Bi-morithly Check panel vent air filters(2). Clean or replace as necessary <br /> ....................... <br /> Check Feed Gas Air Dryer filter bowl. A find dust may develop over time on s er, no <br /> Monthly to Bi-morithly moisture should be present in the bowl. If moisture is present contact us. the Jilt__I�W <br /> Check Feed Gas Air Dryer inside the system control panel: Red light should cycle on and <br /> Monthly to Bi-monthly off every few minutes,when exhaust gas is discharged. It exhaust air discharge is on <br /> . continuously,contact us <br /> .. .... <br /> 0323)0 ................................................ <br /> Monthly to Bi-monthly Check all lines for moisture-ensure that the air compressor system is feeding dry air to the <br /> ozone generator panel. <br /> ——-----—------------------------------- <br /> Monthly,to Bi"mprith,ly Check I(;much screen)for system alarms and verify operation. <br /> Bi weekly Check integrity of all hoses,fittings,piping,and valves <br /> ................. .... 3 ;0 ........................ <br /> Bi-weekly Inspect electrical cal fittings and tighten as needed <br /> ............................... .............. ........................ ............ <br /> BiweeklyCheck controller operation D-3 423/0 <br /> — <br /> As-Needed Adjust con'troller'program",- ' '-­ <br /> Bi-weekly Check flow and pressure on assemblies(system and wells) <br /> .......... - <br /> Bi-weekly <br /> ­­1.11.___­_________ I'll I'll, . ......................... <br /> i-weekly Take ozone readings at compound and well boxes <br /> .......... .. .. ................ <br /> Bi-weekly Take RD Readings <br /> ............ ............. ................................ <br /> . ........................................... <br /> Bi-weekly Check wellhead connections <br /> ................................ <br /> ...................................... <br /> Bi-weekly Check/tesi all safety override systems <br /> ........................ <br /> ....................... ................................... <br /> Bi-weekly Measure Compressor Running Amperage <br /> ... ......... ....... ..... ...... <br /> Bi-weekly Check Compressor Oii <br /> As-Needed Clean o-mp-r—ess—rInlet Filter <br /> ................ .................... .......................................... <br /> t I <br /> Calton Systems 925-277-0665 <br /> NOTES AND DESCRIPTION OF ACTIVITIES ON SITE <br /> Page 3 of 3 <br />