My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CORRESPONDENCE_2017-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREWERT
>
916
>
4400 - Solid Waste Program
>
PR0526865
>
CORRESPONDENCE_2017-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2024 11:30:21 AM
Creation date
5/11/2021 1:39:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
CORRESPONDENCE
FileName_PostFix
2017-2018
RECORD_ID
PR0526865
PE
4443
FACILITY_ID
FA0018195
FACILITY_NAME
CENTRAL VALLEY COMPOST
STREET_NUMBER
916
Direction
W
STREET_NAME
FREWERT
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19126022
CURRENT_STATUS
01
SITE_LOCATION
916 W FREWERT RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Don Mooney <br /> March 29, 2017 <br /> Page 3 <br /> is no posted speed limit, under California Vehicle Code § 22349 (b) the speed <br /> limit is 55 miles per hour. <br /> Ten-ton trucks have a maximum width of 8' 6". When trucks traveling in opposed <br /> directions pass one another on Frewert, if drivers center the vehicles in their own j <br /> lanes, they have 18 inches between them and 9 inches to the edge limit. When <br /> opposed trucks or a truck and a car meet close to where someone is bicycling in <br /> a lane or walking on the most walkable portion of the shoulder there is a conflict <br /> problem. The controlling guidance for lane width on local streets in California is <br /> A Policy on Geometric Design of Highways and Streets by the American <br /> Association Of State Highway and Transportation Officials (AASHTO). This <br /> document states that a road width of 20 feet is considered adequate only for low- <br /> volume roads where meetings and passings are infrequent and truck volume is <br /> low. If there really are only 58 trucks per day entering and then, after weighing <br /> and unloading, leaving the facility and they are spaced out evenly over the full 12 <br /> hours of operation, there will be 12.41 minutes between trucks entering the <br /> facility'. Given the time it takes to drive the length of Frewert and go through the <br /> unloading protocol, there is a high probability that every truck entering the facility <br /> will encounter a truck leaving the facility somewhere on Frewert. The facts that <br /> truck approaches will be random rather than evenly spaced and that truck traffic <br /> will likely be more concentrated in some hours of the day than others make truck <br /> meetings even more probable. And the fact that truck trips associated with <br /> export of the finished compost may not have been accounted for makes truck <br /> meetings yet more likely. Hence, not even considering any other traffic on the <br /> road, this simply does not constitute a situation where 'meetings and passings <br /> are infrequent' makes the 20 foot width of Frewart inadequate for this usage. <br /> Given the conditions, adding more heavy truck traffic onto a 20-foot wide road <br /> that has no improved shoulders or sidewalks and that has resident foot traffic, <br /> bike traffic and recreational traffic along it, extending that truck traffic into the <br /> evening commute period and extending that truck traffic into Sundays certainly <br /> would be a potentially significant traffic safety impact that the IS/MND fails to <br /> disclose as such or mitigate. <br /> Conclusion That Traffic Impact Fees Will Be Sufficient For The County To <br /> Maintain Frewert Road Has No Basis. <br /> In response to a question from the public, County staff asserted that the Project's <br /> payment of traffic impact fees would be sufficient to offset cost of maintenance <br /> for whatever damage the Project's heavy truck traffic would do to the pavement <br /> of Frewert Road. We digress to observe that the necessary structural strength of <br /> road pavements used in design or to assess the adequacy of an existing <br /> Or for someone standing.walking or bicycling along Frewert,a truck from the Project will pass in one <br /> direction or the other once every 6.2 minutes. For people along a road this narrow,each truck passing,to <br /> say nothing of being near truck meetings,will seem annoying,unpleasant and dangerous. <br /> RAI 1:1C • 'I'It:%N,si,oR,rATI 0N • NANAGLNILN I <br /> X3)1 Lowry Road. Union City,CA 94587 tel:510.459.9477 lax: 510.48994-18 <br /> ., r <br />
The URL can be used to link to this page
Your browser does not support the video tag.