My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BROADWAY
>
1905
>
2900 - Site Mitigation Program
>
PR0518600
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2021 4:55:47 PM
Creation date
5/11/2021 4:35:47 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0518600
PE
2960
FACILITY_ID
FA0013996
FACILITY_NAME
CROP PRODUCTION SERVICES
STREET_NUMBER
1905
Direction
N
STREET_NAME
BROADWAY
City
STOCKTON
Zip
95205
APN
14315004
CURRENT_STATUS
01
SITE_LOCATION
1905 N BROADWAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.2 Well Destruction Procedure <br /> The wells will be abandoned according to California Department of Water Resources (DWR) <br /> Water Well Standards (Bulletins 74-81 and 74-90) and EHD requirements. During abandonment, <br /> the well monuments, concrete pads, and surrounding bollards will be removed. The upper five <br /> feet of each well will also be removed and the well casings will be sealed using a neat cement <br /> from the bottom of the wells to approximately five feet below surface grade. Clean fill will be placed <br /> in the remaining annulus to surface grade. <br /> 9.0 REPORTING AND SCHEDULING <br /> Field activities will be initiated after receiving the RWQCB's authorization to proceed, obtaining <br /> the well installation permits, and securing the NOI. A Well Installation and Pilot Test <br /> Implementation Report will be submitted after completing the injection field activities. At a <br /> minimum, the report will contain: <br /> • Descriptions of the well installation and destruction methods; <br /> • Boring logs and well construction diagrams; <br /> • Details of well development method and the development logs; <br /> • Well sampling field logs; <br /> • Descriptions of the injection methods and volumes; <br /> • Figures depicting well locations and pre-injection groundwater analytical data; <br /> • Laboratory analytical report; and <br /> • Well survey data. <br /> The post-injection groundwater analytical results will be reported in the subsequent semi-annual <br /> groundwater monitoring and sampling reports for the site. <br /> CPS Stockton, California 8 <br /> Pilot Test Work Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.