My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
J
>
JACK TONE
>
1501
>
2300 - Underground Storage Tank Program
>
PR0505264
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2022 12:53:04 PM
Creation date
5/12/2021 9:57:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0505264
PE
2361
FACILITY_ID
FA0006672
FACILITY_NAME
FLYING J TRAVEL PLAZA #618*
STREET_NUMBER
1501
Direction
N
STREET_NAME
JACK TONE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
22811017
CURRENT_STATUS
01
SITE_LOCATION
1501 N JACK TONE RD
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O A Q U I N Environmental Health Department <br /> - - COUNTY ---- <br /> UST SYSTEM RETROFIT OR REPAIR <br /> ( Submit minimum of 3 sets of plans & applications as originals will be retained by EHD ) <br /> 1 . Site map enclosed ? YES W NO [ ] <br /> 2 . Submit copies of ICC Service Technician and /or Installer's certificate and all manufacturer training <br /> certificates for each person installing or testing any component that is repaired or replaced . Ensure a copy of <br /> the "Site Health and Safety Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a <br /> diagram drawn to scale showing location of repairs and /or replacements . If repairing a component , describe <br /> how this will be done . ( If adding piping , UDC ' s , or other UST equipment , or performing tank top upgrade , <br /> use the UST Installation Application pages 4 -8 as necessary for a timely plan review) : <br /> Tank 4- Break concrete around Tank 4 Fill Spill bucket , remove and replace spill bucket , pour <br /> back concrete , perform testing and inspection where required . PN : Phil -Tite 85100 - 1 <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third - party approval ) : <br /> Phiktite 85100 - 1 <br /> ination Procedures : <br /> a . Will piping ie4waLgjWinated prior to removal ? YES [ ] NO [ ] <br /> b . Identify contractor performin ation : <br /> Name ne �) <br /> Address City <br /> 3of6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.