My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
14001
>
2800 - Aboveground Petroleum Storage Program
>
PR0518071
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2021 4:26:05 PM
Creation date
5/18/2021 4:19:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518071
PE
2831
FACILITY_ID
FA0003163
FACILITY_NAME
WIMPYS MARINA CAFE
STREET_NUMBER
14001
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
WALNUT GROVE
Zip
95690
APN
00104002
CURRENT_STATUS
01
SITE_LOCATION
14001 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B PLAN FIELD <br /> (4) A flowline/intra-facility gathering line maintenance program to <br /> prevent discharges is prepared and implemented and includes the <br /> following procedures: <br /> (i) Flowlines and intra-facility gathering lines and associated valves ❑ Yes No NA ❑ Yes❑No❑NA <br /> and equipment are compatible with the type of production fluids, <br /> their potential corrosivity,volume, and pressure, and other <br /> conditions expected in the operational environment <br /> (ii) Flowlines and intra-facility gathering lines and associated ❑ Yes No NA ❑ Yes❑No❑NA <br /> appurtenances are visually inspected and/or tested on a periodic <br /> and regular schedule for leaks, oil discharges, corrosion, or other <br /> conditions that could lead to a discharge as described in §112.1(b). <br /> If flowlines and intra-facility gathering lines are not provided with ❑ Yes ❑ No❑NA ❑ Yes❑No❑NA <br /> secondary containment in accordance with§112.7(c),the <br /> frequency and type of testing allows for the implementation of a <br /> contingency plan as described under 40 CFR 109 or an FRP <br /> submitted under§112.20 <br /> (iii) Repairs or other corrective actions are made to any flowlines and ❑ Yes❑No❑1 NA ❑ Yes❑No❑NA <br /> intra-facility gathering lines and associated appurtenances as <br /> indicated by regularly scheduled visual inspections, tests, or <br /> evidence of a discharge <br /> (iv) Oil removed or other actions initiated to promptly stabilize and ❑ Yes No❑NA ❑ Yes❑No❑NA <br /> remediate any accumulation of oil discharges associated with the <br /> produced water containers <br /> ATTACHMENT B ❑NA PLAN FIELD <br /> ONSHORE OIL DRILLING AND WORKOVER FACILITIES-40 CFR <br /> 112.10 <br /> 112.10(b) Mobile drilling or workover equipment is positioned or located to ❑ Yes ❑ No ❑NA ❑ Yes❑No❑NA <br /> prevent a discharge as described in§112.1(b) <br /> 112.10(c) Catchment basins or diversion structures are provided to intercept ❑ Yes ❑ No❑NA ❑ Yes❑No❑NA <br /> and contain discharges of fuel, crude oil, or oily drilling fluids <br /> 112.10(d) Blowout prevention (BOP)assembly and well control system ❑ Yes ❑No❑NA ❑ Yes ❑No ❑NA <br /> installed before drilling below any casing string or during workover <br /> operations <br /> BOP assembly and well control system is capable of controlling ❑ Yes ❑ No❑NA ❑ Yes❑No❑NA <br /> any well-head pressure that may be encountered while on the well <br /> Comments: <br /> Tier 1 Qualified Facilities Page B-3 of 4 June 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.