Laserfiche WebLink
ATTACHMENT B PLAN FIELD <br /> (4) A flowline/intra-facility gathering line maintenance program to <br /> prevent discharges is prepared and implemented and includes the <br /> following procedures: <br /> (i) Flowlines and intra-facility gathering lines and associated valves ❑ Yes No NA ❑ Yes❑No❑NA <br /> and equipment are compatible with the type of production fluids, <br /> their potential corrosivity,volume, and pressure, and other <br /> conditions expected in the operational environment <br /> (ii) Flowlines and intra-facility gathering lines and associated ❑ Yes No NA ❑ Yes❑No❑NA <br /> appurtenances are visually inspected and/or tested on a periodic <br /> and regular schedule for leaks, oil discharges, corrosion, or other <br /> conditions that could lead to a discharge as described in §112.1(b). <br /> If flowlines and intra-facility gathering lines are not provided with ❑ Yes ❑ No❑NA ❑ Yes❑No❑NA <br /> secondary containment in accordance with§112.7(c),the <br /> frequency and type of testing allows for the implementation of a <br /> contingency plan as described under 40 CFR 109 or an FRP <br /> submitted under§112.20 <br /> (iii) Repairs or other corrective actions are made to any flowlines and ❑ Yes❑No❑1 NA ❑ Yes❑No❑NA <br /> intra-facility gathering lines and associated appurtenances as <br /> indicated by regularly scheduled visual inspections, tests, or <br /> evidence of a discharge <br /> (iv) Oil removed or other actions initiated to promptly stabilize and ❑ Yes No❑NA ❑ Yes❑No❑NA <br /> remediate any accumulation of oil discharges associated with the <br /> produced water containers <br /> ATTACHMENT B ❑NA PLAN FIELD <br /> ONSHORE OIL DRILLING AND WORKOVER FACILITIES-40 CFR <br /> 112.10 <br /> 112.10(b) Mobile drilling or workover equipment is positioned or located to ❑ Yes ❑ No ❑NA ❑ Yes❑No❑NA <br /> prevent a discharge as described in§112.1(b) <br /> 112.10(c) Catchment basins or diversion structures are provided to intercept ❑ Yes ❑ No❑NA ❑ Yes❑No❑NA <br /> and contain discharges of fuel, crude oil, or oily drilling fluids <br /> 112.10(d) Blowout prevention (BOP)assembly and well control system ❑ Yes ❑No❑NA ❑ Yes ❑No ❑NA <br /> installed before drilling below any casing string or during workover <br /> operations <br /> BOP assembly and well control system is capable of controlling ❑ Yes ❑ No❑NA ❑ Yes❑No❑NA <br /> any well-head pressure that may be encountered while on the well <br /> Comments: <br /> Tier 1 Qualified Facilities Page B-3 of 4 June 2014 <br />