Laserfiche WebLink
ATTACHMENT E: SPCC CONTINGENCY PLAN REVIEW CHECKLIST ❑1 NA <br /> 40 CFR Part 109—Criteria for State, Local and Regional Oil Removal Contingency Plans <br /> If SPCC Plan includes an impracticability determination for secondary containment in accordance with §112.7(d),the facility <br /> owner/operator is required to provide an oil spill contingency plan following 40 CFR part 109, unless he or she has submitted a FRP <br /> under§112.20. An oil spill contingency plan may also be developed, unless the facility owner/operator has submitted a FRP under <br /> §112.20 as one of the required alternatives to general secondary containment for qualified oil filled operational equipment in <br /> accordance with §112.7(k). <br /> 109.5—Development and implementation criteria for State, local and regional oil removal contingency plans,6 Yes No <br /> (a) Definition of the authorities, responsibilities and duties of all persons, organizations or agencies which are to <br /> be involved in planning or directing oil removal operations. <br /> (b) Establishment of notification procedures for the purpose of early detection and timely notification of an oil <br /> discharge including: <br /> (1) The identification of critical water use areas to facilitate the reporting of and response to oil discharges. <br /> (2) A current list of names,telephone numbers and addresses of the responsible persons(with alternates)and <br /> organizations to be notified when an oil discharge is discovered. <br /> (3) Provisions for access to a reliable communications system for timely notification of an oil discharge, and the <br /> capability of interconnection with the communications systems established under related oil removal <br /> contingency plans, particularly State and National plans(e.g., National Contingency Plan (NCP)). <br /> (4) An established, prearranged procedure for requesting assistance during a major disaster or when the <br /> situation exceeds the response capability of the State, local or regional authority. <br /> (c) Provisions to assure that full resource capability is known and can be committed during an oil discharge ❑ <br /> situation including: <br /> (1) The identification and inventory of applicable equipment, materials and supplies which are available locally <br /> and regionally. <br /> (2) An estimate of the equipment, materials and supplies that would be required to remove the maximum oil <br /> discharge to be anticipated. <br /> (3) Development of agreements and arrangements in advance of an oil discharge for the acquisition of <br /> equipment, materials and supplies to be used in responding to such a discharge. <br /> (d) Provisions for well-defined and specific actions to be taken after discovery and notification of an oil discharge <br /> including: <br /> (1) Specification of an oil discharge response operating team consisting of trained, prepared and available <br /> operating personnel. <br /> (2) Pre-designation of a properly qualified oil discharge response coordinator who is charged with the <br /> responsibility and delegated commensurate authority for directing and coordinating response operations and <br /> who knows how to request assistance from Federal authorities operating under existing national and regional <br /> contingency plans. <br /> (3) A preplanned location for an oil discharge response operations center and a reliable communications system <br /> for directing the coordinated overall response operations. <br /> (4) Provisions for varying degrees of response effort depending on the severity of the oil discharge. <br /> (5) Specification of the order of priority in which the various water uses are to be protected where more than one ❑ <br /> water use may be adversely affected as a result of an oil discharge and where response operations may not <br /> be adequate to protect all uses. <br /> (e) Specific and well defined procedures to facilitate recovery of damages and enforcement measures as <br /> provided for by State and local statutes and ordinances. <br /> 6 The contingency plan should be consistent with all applicable state and local plans,Area Contingency Plans,and the NCP. <br /> Tier 1 Qualified Facilities Page E-1 of 2 June 2014 <br />