My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
14001
>
2800 - Aboveground Petroleum Storage Program
>
PR0518071
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2021 4:26:05 PM
Creation date
5/18/2021 4:19:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0518071
PE
2831
FACILITY_ID
FA0003163
FACILITY_NAME
WIMPYS MARINA CAFE
STREET_NUMBER
14001
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
WALNUT GROVE
Zip
95690
APN
00104002
CURRENT_STATUS
01
SITE_LOCATION
14001 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUIREMENTS FOR PREPARATION AND IMPLEMENTATION OF A SPCC PLAN-40 CFR 112.3 <br /> Date facility began operations: UNKNOWN <br /> Date of initial SPCC Plan preparation: N/A Current Plan version (date/number): NONE <br /> 112.3(a) For facilities(except farms), including mobile or portable facilities: <br /> • In operation on or prior to November 10, 2011: Plan prepared and/or amended and fully ❑Yes D No DNA <br /> implemented by November 10, 2011 <br /> • Facilities beginning operation after November 10, 2011: <br /> o Oil production facilities-Plan prepared and fully implemented within six months ❑Yes ❑No ❑NA <br /> after beginning operations; or <br /> o All other facilities-Plan prepared and fully implemented before operations begin ❑Yes ❑No ❑NA <br /> For farms (as defined in §112.2): <br /> • In operation on or prior to August 16, 2002: Plan maintained, amended and ❑Yes ❑No ❑NA <br /> implemented by May 10,2013 <br /> • Beginning operations after August 16, 2002 through May 10, 2013: Plan prepared and ❑Yes ❑No ❑NA <br /> fully implemented by May 10, 2013 <br /> • Beginning operations after May 10, 2013: Plan prepared and fully implemented before ❑Yes ❑No ❑NA <br /> beginning operations <br /> 112.3(e)(1) Plan is available onsite if attended at least 4 hours per day. If facility is unattended, Plan is ❑ Yes❑No❑NA <br /> available at the nearest field office. (Please note nearest field office contact information in <br /> comments section below.) <br /> Comments: <br /> 2002 AERIAL IMAGERY SHOWS HORIZONTAL TANK AT SITE; CURRENT OWNER/OPERATOR MORE RECENT. <br /> AMENDMENT OF SPCC PLAN BY REGIONAL ADMINISTRATOR (RA)-40 CFR 112.4 <br /> 112.4(a),(c) Has the facility discharged more than 1,000 U.S. gallons of oil in a single reportable ❑ Yes❑No <br /> discharge or more than 42 U.S. gallons in each of two reportable discharges in any 12-month <br /> period? <br /> If YES • Was information submitted to the RA as required in§112.4(a)?4 ❑ Yes No El NA <br /> • Was information submitted to the appropriate agency or agencies in charge of oil ❑ Yes❑No 0 NA <br /> pollution control activities in the State in which the facility is located§112.4(c) <br /> • Date(s)and volume(s)of reportable discharges(s)under this section: <br /> • Were the discharges reported to the NRCS. ❑ Yes ❑No <br /> 112.4(d),(e) Have changes required by the RA been implemented in the Plan and/or facility? ❑ Yes❑No Q NA <br /> Comments: <br /> s A reportable discharge is a discharge as described in§112.1(b)(see 40 CFR part 110).The gallon amount(s)specified(either 1,000 or 42)refers to the <br /> amount of oil that actually reaches navigable waters or adjoining shorelines not the total amount of oil spilled.The entire volume of the discharge is oil <br /> for this determination <br /> 4 Triggering this threshold may disqualify the facility from meeting the Qualified Facility criteria if it occurred in the three years prior to self-certification <br /> 5 Inspector Note-Confirm any spills identified above were reported to NRC <br /> Tier I Qualified Facilities Page 4 of 8 June 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.