Laserfiche WebLink
Upon receipt of all analytical and other supporting data, AGS will prepare the <br /> investigation report. The report will be completed within 10 working days following the <br /> receipt of all relevant data. <br /> The time schedule stated above may be modified due to site access restrictions, <br /> equipment availability, and weather conditions. AGS will notify the appropriate <br /> regulatory agencies if significant changes to this schedule become necessary. <br /> 6.0 SIGNATURES AND CERTIFICATION <br /> This work plan was prepared by American Geological Services, Inc. for Mr. Ricardo <br /> Ramirez of the Pacific Cement company for the site located at 1404 West Weber Avenue <br /> in Stockton, California. All work will be performed in accordance with geologic and <br /> hydrogeologic standards in effect at the time of writing. At no time is any warranty, <br /> either expressed or implied, made with respect to the geologic or hydrologic conditions at <br /> the subject site. <br /> This work plan was prepared by: <br /> DG <br /> 0 GFG`O <br /> GLEN <br /> WHITE cP <br /> j <br /> NO. 65 \Q. <br /> Glen T. White, MS � <br /> California Registered Geologist#6563 Or CAI SFO <br /> k "'�I L "— <br /> Daniel L. Hambrick, B.S. <br /> Geologist <br /> American Geological Services, Inc. <br /> CA99DE-095 8 <br />