Laserfiche WebLink
Project Health and Safety Plan, and any subsequent changes; <br /> Project Work Plan, and any subsequent changes; <br /> Site Entry Log; <br /> On-site personnel, their affiliation, and purpose; <br /> Chain-of-Custody Forms <br /> Daily Field Log, describing activities and conditions; <br /> Project Safety Inspection Reports; <br /> Tailgate Safety Meeting attendance record; <br /> Worker illness and/or injury reports; <br /> Accident Log. <br /> The following records will be kept at the offices of American Geologic Services, Inc. and its <br /> subcontractors: <br /> Accident Logs, OSHA Form 200 or equivalent; <br /> Hazards Materials Training Records; <br /> Medical Surveillance; <br /> Safety Inspection Reports; <br /> Personal Monitoring Records; <br /> 12.0 CONTINGENCY PLAN, EMERGENCY RESPONSE CONTACTS AND <br /> TELEPHONE NUMBERS <br /> In the event of an emergency or accident, the personnel observing the condition shall give three <br /> sharp blasts of a vehicle horn, or other prearranged emergency alarm. All nonessential <br /> communication shall immediately cease and the team member shall notify the Project Manager <br /> and Health and Safety Officer. Actions to be taken will be dictated by the emergency. All <br /> injured personnel will be taken to the designated local medical facility by the Health and Safety <br /> Officer or local emergency medical personnel. <br /> The project Health and Safety Plan will contain the following specific emergency contacts for the <br /> project location, where locally available: <br /> American Geological Services,Inc. <br /> 13 <br />