My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18846
>
3000 – Underground Injection Control Program
>
PR0546051
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:26 PM
Creation date
5/19/2021 10:17:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3000 – Underground Injection Control Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0546051
PE
3030
FACILITY_ID
FA0003883
FACILITY_NAME
VICTOR FINE FOODS
STREET_NUMBER
18846
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
01709051
CURRENT_STATUS
02
SITE_LOCATION
18846 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment Q <br /> Plugging and Abandonment Plan <br /> Victor Fine Foods Deep Injection Well #1 <br /> Plugging and abandonment of the injection well will be done approximately in the follow- <br /> ing manner: <br /> 1. Move in and rig up abandonment rig. Remove wellhead tree, then install and ac- <br /> tivate Blowout Prevention Equipment (BOPE). Unseat packer and pull 4-1/2 inch <br /> tubing and packer from the hole. <br /> 2. Make: a bailer run to check for fill. The depth of fill should be at least 50 feet below <br /> the casing shoe. Injection waste fluids will be flushed out of the injection casing by <br /> injecting sufficient freshwater into the well. <br /> 3. Run in hole with 4-1/2 inch tubing and 2-7/8 inch tubing stinger to the top of fill. <br /> 4. Cement well from bottom to top with common portland cement/sand mix, withdrawing <br /> the tubing strings in stages as the cement is pumped in. <br /> 5. Remove BOPE and lay down and move off rig. <br /> 6. Cut off wellhead and weld a steel plate 3/8-inch thick to cap off inner casing (7 inch). <br /> The ground will be leveled and an abandonment marker posted with pertinent well in- <br /> formation. <br /> 7. Cost estimate at effective date of this permit: $20,000 <br /> 24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.