My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:18 PM
Creation date
5/19/2021 10:36:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br /> 1 . Site map enclosed ? YES [A NO [ ] <br /> 2 . Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced . Ensure a copy of the " Site Health and Safety <br /> Plan " is available on the jobsite as required by Title 8 . <br /> 3 . Detailed description of work to be completed . List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements . If repairing a component , describe how this will be done . ( If <br /> adding piping , UDC ' s , or other UST equipment, or performing tank top upgrade , use the UST Installation Application <br /> pages 4 -8 as necessary for a timely plan review) : <br /> Repair 87/91 tank annular and install new NOV piping penetrations on product, vr, and vent lines 87 & 91 <br /> turbine sumps . Also install new Bravo F series electrical penetrations in turnbine sumps per attached SOW <br /> 4 . List of equipment to be used (Attach manufacturer' s specification sheets showing third - party approval) : <br /> i <br /> Attached i <br /> i <br /> i <br /> i <br /> i <br /> EH230038 (revised 7-26-2016) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.