Laserfiche WebLink
02/18/04 16:54 <br /> CH2M Hill Project: PG&E-Lathrop <br /> 155 Grand Ave.;Suite 1000 Project Number: 283984.0l.CM CLS Work Order#: CNB0565 <br /> Oakland,CA 94612 Project Manager: Bob Noyes COC#:47345 <br /> Notes and Definitions <br /> QM-07 The spike recovery was outside acceptance limits for the MS and/or MSD. The batch was accepted based on acceptable <br /> LCS/LCSD recovery. <br /> DET Analyte DETECTED <br /> ND Analyte NOT DETECTED at or above the reporting limit <br /> NR Not Reported <br /> dry Sample results reported on a dry weight basis <br /> RPD Relative Percent Difference <br />