My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_REMEDIAL ACTION DOCUMENT
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILLOW GLEN
>
13751
>
2900 - Site Mitigation Program
>
PR0009025
>
ARCHIVED REPORTS_REMEDIAL ACTION DOCUMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 2:55:48 PM
Creation date
5/19/2021 12:15:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
REMEDIAL ACTION DOCUMENT
RECORD_ID
PR0009025
PE
2960
FACILITY_ID
FA0004055
FACILITY_NAME
LATHROP GAS DEHYDRATOR
STREET_NUMBER
13751
Direction
S
STREET_NAME
WILLOW GLEN
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
19105010
CURRENT_STATUS
01
SITE_LOCATION
13751 S WILLOW GLEN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k5i KLEIN FELDER <br /> An employee owned company <br /> File No. 43353 <br /> April 23, 2004 <br /> Mr. Robert Noyes <br /> CH2M Hill <br /> 2485 Natomas Park Drive, Suite 600 <br /> Sacramento, CA 95833 <br /> Subject: FINAL SPECIAL INSPECTION& TESTING REPORT <br /> FIELD DENSITY TESTS <br /> PG&E PIPELINE <br /> STOCKTON, CALIFORNIA <br /> PERMIT NO. 0303801 <br /> Dear Mr. Noyes: <br /> This report presents the results of compaction tests taken at the subject project. As requested, a <br /> representative of our firm observed earthwork operations and performed tests at the site on April <br /> 21 and 22, 2004, on an intermittent basis. Eighteen tests were taken by the nuclear probe test <br /> method at random locations on excavation backfill. The depth of backfill was approximately 6 <br /> feet in the west portion and 3 feet in the east portion. The top 3 feet of the easterly portion was <br /> backfilled with native soil without density tests performed. The area was designated as non- <br /> structural for farm land use. The test results, summarized on the attached table, conform to the <br /> compaction requirements of the project specifications. <br /> We have employed accepted engineering and testing procedures. However, we do not undertake <br /> the guarantee of construction, nor do we relieve the contractor of his primary responsibility to <br /> produce a completed project conforming to the project plans and specifications. <br /> If you have any questions about this report, please call our office. <br /> Respectfully submitted, <br /> KLEINFELDER, INC. <br /> Dennis A. Quashnick, P.E. <br /> Project Engineer <br /> DAQ:ss <br /> Attachment <br /> ccs: Mr. Cecil Gore, CH2M Hill <br /> San Joaquin County Building Inspection Department <br /> 43353/ST04R543 <br /> KLEWDW�Rleidk?dc�alddAyrtle Street, Stockton, CA 95205-4794 (209)948-1345 (209) 948-0621 fax <br />
The URL can be used to link to this page
Your browser does not support the video tag.