Laserfiche WebLink
Contents <br /> Acronyms/Abbreviations............................................................................................................v <br /> 1.0 Introduction .....................................................................................................................1 <br /> 2.0 Background......................................................................................................................2 <br /> 2.1 Project Roles and Responsibilities.........................................................................2 <br /> 3.0 Field Activities.................................................................................................................4 <br /> 3.1 Summary of Field Activities...................................................................................4 <br /> 3.2 Monitoring Well Abandonment............................................................................4 <br /> 3.3 Site Preparation/Equipment Demolition.............................................................5 <br /> 3.4 Pre-Disposal Soil Characterization........................................................................6 <br /> 3.5 Soil Excavation.........................................................................................................7 <br /> 3.6 Verification Sampling..............................................................................................8 <br /> 3.7 Backfilling.................................................................................................................9 <br /> 3.8 Final Site Grading and Restoration.......................................................................9 <br /> 3.9 Groundwater Monitoring System.......................................................................10 <br /> 4.0 Conclusions....................................................................................................................11 <br /> 5.0 References.......................................................................................................................12 <br /> Tables <br /> 1 Results of Verification and Stockpile Soil Sampling <br /> 2 Results of Soil Sampling for Over-Excavation <br /> 3 Results of Pre-Disposal Soil Sampling <br /> 4 Results of Demolition Soil Sampling <br /> Figures <br /> 1 Site Location Map <br /> 2 Site Plan and Demolished Features <br /> 3 Final Excavation Limit,Verification and Over-excavation Sample Locations <br /> 4 Final Site Plan <br /> SFOILATHROPCOMPLETIONREPORT 12-1-04.DOC ii <br />