My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILLOW GLEN
>
13751
>
2900 - Site Mitigation Program
>
PR0009025
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 2:53:15 PM
Creation date
5/19/2021 12:30:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0009025
PE
2960
FACILITY_ID
FA0004055
FACILITY_NAME
LATHROP GAS DEHYDRATOR
STREET_NUMBER
13751
Direction
S
STREET_NAME
WILLOW GLEN
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
19105010
CURRENT_STATUS
01
SITE_LOCATION
13751 S WILLOW GLEN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Message Page 7 of 8 <br /> remedial excavations, <br /> and that you wished to be <br /> present when this was <br /> done. Because it is <br /> extremely difficult to over <br /> drill an already grouted <br /> borehole with standard <br /> environmental drilling <br /> equipment, we propose <br /> to over drill the well to the <br /> installation depth of 20- <br /> feet bgs with a large- <br /> diameter, solid-flight <br /> post-hole type drilling rig, <br /> and backfill the borehole <br /> with grout. The well <br /> is located within our <br /> proposed excavation <br /> perimeter, in an area that <br /> is to be excavated to <br /> about 10-12 feet bgs. <br /> We understand that you <br /> are satisfied with this <br /> method and that you will <br /> let us use the existing <br /> well abandonment permit <br /> that was approved last <br /> August. We also <br /> understand that you will <br /> inform us of the payment <br /> required for you to come <br /> out and inspect the over <br /> drilling procedure once <br /> you get an estimate of <br /> the time/cost from your <br /> accounting department <br /> less any credit remaining <br /> in our account. <br /> Our project manager, <br /> Bob Noyes, and our <br /> onsite construction <br /> superintendent, Cecil <br /> Gore, will schedule the <br /> drilling and contact you at <br /> least 48 hours prior so <br /> you can observe the <br /> work. At your request, the <br /> over drilling and <br /> regrouting of this <br /> borehole will take place <br /> at least 24 hours prior to <br /> excavating soil near the <br /> well. Currently, the <br /> excavation work is <br /> scheduled to commence <br /> in approximately 2 weeks <br /> time. <br /> 2/13/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.