Laserfiche WebLink
Section 8 <br /> PROJECT SCHEDULE <br /> The proposed investigation will start upon receiving authorization and will be based on the availability of drill <br /> rigs and personnel. Phases I and II will require a total of one to two weeks to complete depending on the <br /> total number of soil borings drilled and monitoring wells installed. A site characterization report will be <br /> - available approximately eight weeks after completion the field activities (see Proposed Project Schedule, <br /> Figure 4). <br /> f <br /> 462891/42/PPU26 8-1 <br /> 462891/42/PPU26 8-2 <br />