Laserfiche WebLink
Proposed Schedule <br /> PG&E's Lathrop Gas Dehydrator Station <br /> San Joaquin County,California <br /> Task 22-May 29-May SJun 12-Jun 194un 26-Jun 3-Jul 10Jul 17-Jul 24-Jul 31-Jul 7-Aug 14-Aug 21-Aug 28-Aug 4-Sep 11-sep 18Sep 25�ep <br /> Workplan Approved/Authorized to Proceed ❑ <br /> Complete Land Access Agreement 0 <br /> Obtain PG&E Funding Approval <br /> Develop Contract for Drilling Services O <br /> Well Installation and Soil Sampling 0 <br /> Well Development and Water Sampling 0 <br /> Laboratory Analyses of Samples <br /> Tidal Influence Study (� <br /> Analysis of Results <br /> Prepare First Draft of Summary Report <br /> In-House Review of Draft Report <br /> Finalize Report <br /> �O D <br /> M <br /> �z Ci <br /> D coo <br /> � <br /> D cry <br />