Laserfiche WebLink
Explanation <br /> x Exploratory Soil Borings <br /> Temporary Wells (1992) <br /> Groundwater Monitoring <br /> Well (1992) <br /> Proposed Groundwater <br /> Monitoring Well <br /> Contactor <br /> • Proposed Soil Boring Tower <br /> O0 25 50 feet Odorizer <br /> X B-9 <br /> • <br /> Former <br /> Reboiler Unit x B-3 • <br /> New <br /> Foundation <br /> Pads <br /> B-4 x <br /> MW-1 � <br /> Reboiler <br /> Discharge Line B-2 <br /> X <br /> X <br /> B-5 <br /> X B-s B-6 <br /> � x <br /> O Above Ground <br /> Production <br /> Odorant Fluids Tanks <br /> Storage O <br /> B-7 <br /> Tanks x <br /> L/ X X X X <br /> Undine Road <br /> Figure 1. Location of proposed groundwater monitoring wells and soil borings at PG&E's <br /> Lathrop Gas Dehydrator Station. <br /> 60007193/0529 RArr I-120A <br />