Laserfiche WebLink
Explanation <br /> A Twining Labs Grab Soil Samples (1988) <br /> • G T I Soil Borings (1988) <br /> X Proposed Soil Borings (Primary) <br /> *Proposed Monitoring Well <br /> Contactor <br /> O Proposed Soil Borings (Secondary) <br /> Tower <br /> Odorizer O <br /> O <br /> 0 25 50 feet <br /> S1 <br /> x <br /> New <br /> Foundation <br /> • Pads <br /> x , <br /> Reboiler S61 x <br /> N/ Discharge Line 53 -ell <br /> SB2• S2 <br /> O <br /> x <br /> SB3 <br /> x <br /> O Above Ground <br /> Production <br /> Odorant Fluids Tanks <br /> Storage O <br /> Tanks 0 <br /> Undine Road <br /> Figure 2. Site plan of PG&E's Lathrop Gas Dehydrator station showing previous sampling <br /> locations and proposed exploratory borings and groundwater monitoring well. <br /> 60007193/G8frl-120 <br /> cca/9-30-92/8913a/JAWP13 3 <br />