My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILLOW GLEN
>
13751
>
2900 - Site Mitigation Program
>
PR0009025
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 3:14:56 PM
Creation date
5/19/2021 12:31:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0009025
PE
2960
FACILITY_ID
FA0004055
FACILITY_NAME
LATHROP GAS DEHYDRATOR
STREET_NUMBER
13751
Direction
S
STREET_NAME
WILLOW GLEN
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
19105010
CURRENT_STATUS
01
SITE_LOCATION
13751 S WILLOW GLEN RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
levels have stabilized, depth to water measurements will be made at each borehole and the top-of-casing <br /> elevations will be surveyed to an arbitrary datum. The surveyed top-of-casing elevations and depth to water <br /> level measurements will be made to an accuracy of 0.01 foot. These measurements will provide information <br /> regarding groundwater flow direction and gradient. After the depth to water level measurements are <br /> completed, the well screen and casing will be removed from each borehole and the boreholes will be <br /> backfilled with neat cement grout containing 5% powdered bentonite from the total depth of the borehole <br /> to the ground surface. The cement grout will either be pumped or tremied into the boreholes. <br /> Soil samples collected during this site investigation will be analyzed by a State of California-certified <br /> laboratory (Chromalab, San Ramon) for total petroleum hydrocarbons as gasoline (TPH-G) by EPA method <br /> 5030/8015,total petroleum hydrocarbons as diesel (TPH-D) by EPA method 3550/8015, total oil and grease <br /> (TOG) by standard method 5520 D&F, and benzene, toluene, ethylbenzene and xylenes (BTEX) by EPA <br /> method 8020. Groundwater samples will be analyzed for TPH-G by EPA method 5030/8015, TPH-D by EPA <br /> method 3510/8015, TOG by standard method 5520 B&F or EPA method 418.1, and BTEX by EPA <br /> method 602. <br /> MONITORING WELL INSTALLATION <br /> As previously stated, one groundwater monitoring well will be drilled and installed at a location adjacent to <br /> the reboiler and associated discharge line (Figure 2). The purpose of this well is to monitor groundwater <br /> quality in the vicinity of the discharge line. The following procedures will be followed during monitoring well <br /> installation. <br /> Borehole Advancement <br /> The borehole will be drilled and sampled to a depth of 10 to 15 feet below the top of the aquifer (--20-25 <br /> feet below ground surface) provided a continuous aquitard is not encountered. If an aquitard (i.e., a stiff <br /> clay layer) is encountered below the water table and is found not to contain elevated levels of petroleum <br /> hydrocarbons using field screening methods (e.g., PID meter), then the vertical continuity of this clay layer <br /> will be verified by sampling and advancing the borehole 41h feet. If the clay layer is found to be greater than <br /> 41h feet thick, the clay will be considered a continuous confining layer and the borehole will be plugged with <br /> bentonite or grout to the top of the clay. The monitoring well will be completed in the portion of the <br /> saturated zone overlying the clay layer. If the clay layer is found to be less than 41h feet thick, the clay will <br /> be considered a localized clay lens and the borehole will be advanced to the designed depth. <br /> Well Construction Procedures <br /> Two-inch diameter, Schedule 40 PVC casing and screen will be used to complete the groundwater <br /> monitoring well (see Figure 3, Typical Monitoring Well Construction Details). The proper lengths of screen <br /> and blank casing will be steam-cleaned and threaded above ground prior to lowering inside the hollow-stem <br /> cca/9-30-92/8913a/JAWP13 9 <br />