Laserfiche WebLink
TECHNICAL REPORT <br /> Upon completion of the field investigation, a final report will be prepared. This report will contain an <br /> assessment of the extent of petroleum hydrocarbons in the area surrounding the reboiler unit and discharge <br /> line. Information regarding the groundwater flow direction and hydraulic gradient, and all chemical analytical <br /> results will be included in the report. Boring logs, the results of the well survey, and the results of any field <br /> testing will also be presented. <br /> cca/9-3o-92/8913a/JAWP13 14 <br />