My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS_CASE 1
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35275
>
2900 - Site Mitigation Program
>
PR0508042
>
FIELD DOCUMENTS_CASE 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2021 4:31:55 PM
Creation date
5/19/2021 3:53:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
CASE 1
RECORD_ID
PR0508042
PE
2960
FACILITY_ID
FA0005316
FACILITY_NAME
U S CAN COMPANY
STREET_NUMBER
35275
Direction
S
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25518009
CURRENT_STATUS
01
SITE_LOCATION
35275 S WELTY RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1002566SV,doc <br /> May 26,2010 <br /> Page 2 of 3 <br /> with the approval of the State Representative. <br /> Failure on the Permittee's part to comply with any provision will be cause for revocation <br /> of this permit. <br /> IMMEDIATELY FOLLOWING COMPLETION OF WORK PERMITTED HEREIN, PERMITTEE SHALL FILL <br /> OUT AND MAIL NOTICE OF COMPLETION PROVIDED BY GRANTOR. <br /> 1 Permittee's attention is directed to Section 6, "CONTROL OF MATERIALS", of the State <br /> Standard Specifications Reference to Engineer in the State Standard Specifications <br /> shall include State Representative. <br /> Permittee is directed to Standard Specification section 7-1.11 Preservation of Property, <br /> and Business and Professions Code, Section 8771. Permittee shall physically inspect <br /> the work site and locate survey monuments prior to work commencement. Monuments <br /> shall be referenced or reset in accordance with Business and Professions Code. <br /> A pre job conference with the Permittee, Contractor, and State Representative may be <br /> required prior to start of work. Permittee shall contact the State Representative and <br /> arrange the meeting. This meeting may be waived at the discretion of the State <br /> Representative. <br /> Notwithstanding General Provision #4, your contractor is required to apply for and <br /> obtain an encroachment permit prior to start of work. <br /> i <br /> Permittee shall, prior to commencement of any work, provide the State Representative <br /> with the name and phone number of the person in responsible charge of the work to <br /> be performed under this permit. <br /> Perm itteelcontractor shall work with the State representative to request the necessary <br /> lane closure needed. Request shall be the week prior to the actual work. The State <br /> representative shall submit closure through the Lane Closure System (LCS) for Traffic <br /> Management Center (TMC) approval by Wednesday afternoon of the week prior. <br /> All Lane closures shall be called in by either the contractor to the TMC when the closure <br /> begins (10-97), ends (10-98), or is cancelled (10-22). The TMC can be reached (24-7) <br /> at (209) 948-7556 or 7551. <br /> Use proper traffic control devices throughout the duration of the project as per Caltrans <br /> Standard Specifications. <br /> All night-time work requires COZEEP and shall be coordinated with the permittee or <br /> contractor. The State representative shall advise permittee that COZEEP must be <br /> present since night-time work is only allowed per lane chart. <br /> Before commencing work, permittee must obtain written concurrence from the State <br /> Highway Resident Engineer on the scheduling of the proposed work. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.