Laserfiche WebLink
APPENDIX A: <br /> PERMITTING,ACCESS,AND SAFETY PROCEDURES <br /> To maintain regulatory and legal compliance,protect the health of all involved persons, and <br /> prevent accidents, The Benham Companies, LLC, an SAIC Company: <br /> • Completed strategic-planning and project-setup activities, including the site-specific <br /> Health and Safety Plan, site-specific Journey Management Plan, and the clearance of <br /> subsurface utilities. <br /> • Determined the ownership of, and obtained access to,private properties on which borings <br /> were to be located. <br /> • Conducted a site visit to mark boring locations for Underground Service Alert(USA), <br /> notified USA at least 48 hours in advance of field activities,and requested USA to mark <br /> underground utilities in the public right of way(ROW). <br /> • Subcontracted Cruz Brothers Locators,a private utility locator, to clear the site and <br /> proposed boring locations for any potential overhead and underground hazards and/or <br /> other potential obstacles. <br /> • Obtained soil boring and monitoring well destruction permits from the San Joaquin <br /> County Environmental Health Department. <br /> • Obtained an encroachment permit from the California Department of Transportation for <br /> borings located within the Highway 33 ROW. <br /> A-1 A p� The Benham Companies,LLC <br /> �ffflff ,%_ A V0.4y Owned Sub,idbry <br /> From Sona f0 Soh b s <br />