Laserfiche WebLink
I V. Surface Condit. .s <br /> A. Is site access adequately restricted? (Y/N) <br /> B. Is the waste adequately covered to prevent human contact? <br /> (Y/N) "Y <br /> C. Is the final drainage system for the site adequate to prevent erosion? <br /> (Y/N) �) <br /> D. Is the final grading adequate to promote run-off? (Y/N) �I <br /> E. Are slopes greater than 3:1 (33% or 18 degrees)? (Y/N) <br /> F. Are slopes greater than 1.75:1 (57% or 30 degrees)? (Y/N) y <br /> V. Postclosure Land Use <br /> A. Has the land use of the site significantly changed since closure? <br /> (Y/N) N <br /> If yes, include or reference site improvement plans and answer the following: <br /> 1. Give the date that the improvements were constructed <br /> 2. Have the improvements compromised the integrity of the final <br /> cover? (Y/N/NA) lel A <br /> 3. Has differential settlement affected the improvements? (Y/N) �I <br /> B. Is there a proposed change in postclosure land use that may jeopardize <br /> the integrity of previously closed sites or pose a potential threat to public <br /> health and safety or the environment? (Y/N) <br /> If yes, briefly describe the proposed project: <br />' <br /> C. Is there a postclosure land use tracking system? (Y/N) � <br /> If yes, describe tracking system: <br /> V1. Dispos2i Site Priority (See Pricritizatior, Chart) <br /> A 1: A 2: A 3: B 1: B 2: B 3: C 1: C 2: C 3: D: <br /> V11. Comments <br /> PREPARED BY: a MPATO DATE: q a� <br /> COMPLIANCE BRAN1bH REVIEW: <br /> C1WMB CLOSURE AND REMEDIATION BRANCH APPROVAL: <br /> Page 4 of 4 <br /> CIWMB Closure and Remediation Branch (1/25/93) <br />