My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
448
>
2900 - Site Mitigation Program
>
PR0009038
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 6:01:31 PM
Creation date
5/20/2021 2:19:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0009038
PE
2960
FACILITY_ID
FA0004035
FACILITY_NAME
STOCKTON REDEVELOPMENT AGENCY
STREET_NUMBER
448
Direction
W
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13726005
CURRENT_STATUS
02
SITE_LOCATION
448 W WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1874
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l <br /> 11. Goals should be specified for the removal of vapors frorn beneath the apartments using <br /> j the SVE apartment wells,specific to protection of apArtment xesidents and integration of <br /> this resident protection with the goals of groundwater protection. <br /> 12. The reporting section should be modified to include subtu#W of data to the CRWQCB- <br /> CVR,DTSC and the RDA. <br /> 13. Each data report should include those items stated in the Work Play and also include <br /> SVE and DPE system flow measurements;depiction of vapor flow vectors to SVE wells <br /> beneath the apartments,to SVE wells beneath the excavation,and to DrE wells;graphs <br /> ' for each analyte detected in the SVE air sampling should include time versus <br /> concentration,ealcu ated slope for each analyte and standard deviation;and aA evaluation <br /> of system effectiveness. <br /> 14. Since geologic interpretation is an integral part of the Work Place,the Work Plan should <br /> be signed and stamped by a Czlifon a&Registered Geologist as specified in the California <br /> ( Business and Professions Code Chapter 12.5.California Code of regulations Title 16 <br /> IDivision 29,and other applicable sections of the Business and Professions Code <br /> (htt�;[r +.geology.ca.got•/]awe Pegs acePAO <br /> If you have any questions,please do not hesitate to contact us. <br /> Sincerely, <br /> Golde to onmental <br /> ylot,R.G.,C.Hg- <br /> Principal Hydrogeologist <br /> X,ns nom;hs,bTmdx City and San Liega Goldea State_Enviromeaml <br /> r(ypar'• Sevr_')-w-Y.1":_tl�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.