Laserfiche WebLink
Stantec <br /> L & M OPERABLE UNIT- FOURTH QUARTER AND ANNUAL 2012 SITE STATUS, <br /> REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT <br /> Annual Summary of Remediation-2012 <br /> February 1, 2013 <br /> 6.2 ASVE SYSTEM OPERATIONAL AND ANALYTICAL SUMMARY- 2012 <br /> During 2012 (December 15, 2011 to December 21, 2012) the ASVE system was 53% <br /> operational (197.7 out of 372 days). The ASVE system is periodically shut down to <br /> accommodate quarterly site monitoring and sampling. The system experienced a period of <br /> downtime during the first quarter as a result of transfer pump malfunction. The transfer pump <br /> plumbing was replaced on February 27, 2012. The system spark arrestor was cleaned on <br /> March 28, 2012 and April 20, 2012. On June 22, 2012 the system was found down due to a <br /> high level alarm in the oil/water separator. The system was shut down on August 10, 2012 and <br /> restarted on August 22, 2012 to accommodate a carbon change out event for the DPE system. <br /> On September 21, 2012 and October 4, 2012 the system was found down on arrival as a <br /> possible result of transfer pump malfunction. On November 9, 2012 the ASVE system blower <br /> overload was found tripped and the system found down on arrival. On December 7, 2012 the <br /> system was found down on arrival. Upon attempted restart it was discovered that the <br /> combustion blower was malfunctioning. On December 21, 2012 the combustion blower motor <br /> was removed and brought to a motor shop for repair. The motor will be repaired, reinstalled, <br /> and the system restarted during January 2013. <br /> During 2012 ASVE the system removed approximately 15.8 lbs. of TPHg, 0.022 lbs. of <br /> benzene, and 0.050 lbs. of MtBE from soil vapor beneath the Delta View Apartments (below). <br /> Approximate Approximate Approximate <br /> Hour TPHg Benzene MtBE <br /> Meter Recovery Recovery Recovery <br /> Date Reading 2012 2012 2012 <br /> Sampled (hours) (lbs.) (lbs.) (lbs.) <br /> 12/15/2011 4,894 <br /> 1/19/2012 5,733 6.2 0.05 0.12 <br /> 2/28/2012 6,262 4.8 0.04 0.09 <br /> 3/16/2012 6,672 4.3 0.04 0.08 <br /> 4/6/2012 6,909 68.0 0.02 0.04 <br /> 4/20/2012 6,910 0.3 0.02 0.04 <br /> 5/8/2012 7,339 4.0 0.03 0.07 <br /> 6/22/2012 7,564 2.1 0.02 0.04 <br /> 7/12/2012 8,042 4.4 0.04 0.08 <br /> 8/15/2012 8,255 1.9 0.02 0.03 <br /> 9/21/2012 8,606 3.2 0.03 0.06 <br /> 10/19/2012 8,902 3.2 0.03 0.06 <br /> 11/28/2012 9,581 6.9 0.06 0.13 <br /> 12/21/2012 9,638 <br /> Reporting Period: December 15,2011 to December 21,2012 <br /> Days in Period: 372 <br /> Days Operational in Period: 197.7 <br /> Period Pounds TPHg Removed: 109.3 <br /> Period Pounds Benzene Removed: 0.40 <br /> Period Pounds MtBE Removed: 0.84 <br /> I:\Tidewater\TW Stockton(P2A)\QMRs\2012\4Q12-Ann ual\4Q12 and Annual QSSR QRSR QMR Stockton_FINAL.doc 6.4 <br />