Laserfiche WebLink
Stantec <br /> L & M OPERABLE UNIT- FOURTH QUARTER AND ANNUAL 2012 SITE STATUS, <br /> REMEDIAL SUMMARY, AND GROUNDWATER MONITORING REPORT <br /> February 1, 2013 <br /> 8.0 Planned Activities for the First Quarter 2013 <br /> The following is a list of planned activities for the first quarter 2013: <br /> • Continue groundwater monitoring and sampling in accordance with MRP <br /> (No. R5-2012-0805). <br /> • Continue with quarterly soil vapor point sampling. <br /> • Perform additional SPH removal events and continue with periodic monitoring and <br /> gauging of SPH wells. <br /> • Continue with routine O&M of existing remediation systems. <br /> • Continuous operation of the ASVE and SVE systems. Operation of the DPE system as <br /> field conditions warrant. <br /> • Continue with installation of the new SPH recovery system off site at the Waterfront <br /> Towers parking area. <br /> • Startup of new SPH recovery system off site at the Waterfront Towers parking area. <br /> • Submit well destruction letter for monitoring wells MW-29, MW-30, MW-32, and MW-33. <br /> I:\Tidewater\TW Stockton(P2A)\QMRs\2012\4Q12-Ann ual\4Q12 and Annual QSSR QRSR QMR Stockton_FINAL.doc 8.1 <br />