Laserfiche WebLink
Table 1 <br /> Monitoring and Sampling Plan <br /> South Shore Parcels-Parcel 2A and Adjacent Areas <br /> West Weber Avenue and North Lincoln Street <br /> Stockton,California <br /> MRP No.R5-2004-0820* MRP No.R5-2012-0805** <br /> 4th Quarter 2011 1st Quarter 2012 2nd Quarter 2012 3rd Quarter 2012 work Completed <br /> During 4th Quarter <br /> 2012 <br /> Monitor Monitor Monitor Monitor Monitor <br /> Well I.D. DTW Sample DTW I Sample DTW i Sample DTW Sample DTW Sample <br /> Explanations(continued): <br /> MS=Mormon Slough <br /> M&S=Monitored and sampled <br /> QCDUP=Duplicate sample <br /> QTR=Quarter <br /> SPH=Separate-Phase Hydrocarbons <br /> -=Not applicable <br /> Dark shading indicates wells that were not monitored and/or sampled. <br /> Notes: <br /> *MRP No.R5-2004-0820 replaces MRP No.R5-2003-0802,and was implemented during the second quarter 2004. <br /> **MRP No.R5-2012-0805 replaces MRP No.R5-2004-0820,and was implemented during the third quarter 2012. <br /> Well 3MW-1 was destroyed and replacement well 3MW-1 R was installed by Clayton Group Services during the second quarter 2003. <br /> Wells MW-36,MW-38 and MW-39 were installed on April 10,2003. <br /> Well MW-37 was installed on May 9,2003. <br /> Wells DPE-8 through DPE-12 were installed during the third quarter 2003. <br /> Wells MW-40 through MW-46 installed by SECOR during the second quarter 2004. <br /> Wells MW-36 and 3MW-1 R were destroyed by Clayton on April 5,2004. <br /> Wells MW-47 through MW-55 were installed by SECOR during the second quarter 2005. <br /> Well DPE-13 was installed during the first quarter 2006. <br /> Well MW-34 was buried and damaged due to recent construction activities by the City of Stockton during 2Q06 <br /> Well MW-6 was destroyed by Golden State Environmental in June 2007. <br /> Well MW-06R was reinstalled in the vicinity of former MW-6 by Wallace Kuhl in November 2008;however,MW-6R was abandoned by <br /> Wallace Kuhl during the third quarter 2010. <br /> Well 2BMW-1 was abandoned by Wallace Kuhl during the second quarter 2010. <br /> lATidewater\TW Stockton(P2A)\Tables\QMR Tables\2012\4Q12\4012-Parcel2A Monitoring and Sampling Plan(Table 1 and Table 2)SPH vs.time.xlsz Page 3 of 3 <br />