My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 4:12:26 PM
Creation date
5/20/2021 3:19:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENESIS ENGINEERING&REDEVELOPMENT <br /> TABLE OF CONTENTS <br /> 1.0 INTRODUCTION..................................................................................................... 1 <br /> 2.0 GEOLOGY AND HYDROGEOLOGY.................................................................. 1 <br /> 2.1 Geology................................................................................................................ 1 <br /> 2.2 Hydrogeology ......................................................................................................2 <br /> 2.3 Surface and Groundwater Use in the Site Vicinity..............................................2 <br /> 3.0 SCOPE OF WORK...................................................................................................3 <br /> 3.1 Task 1 —Pre-Field Activities................................................................................3 <br /> 3.2 Task 2—Direct-Push Reconnaissance Borings ...................................................4 <br /> 3.3 Task 3 —Monitoring Well Installation.................................................................4 <br /> 3.4 Task 4—Monitoring Well Sampling and Analysis.............................................. 5 <br /> 3.5 Task 5 —Statistical Analysis of Background Water Quality Data....................... 5 <br /> 3.6 Task 6—Disposal of Investigation Derived Waste.............................................. 5 <br /> 3.7 Task 7—Site Investigation Report....................................................................... 6 <br /> 3.8 Task 8—Water Quality Monitoring Plan.............................................................6 <br /> 4.0 SCHEDULE...............................................................................................................7 <br /> FIGURES <br /> Figure 1 Site Location Map <br /> Figure 2 Site Vicinity Map <br /> Figure 3 Proposed Reconnaissance Boring Locations <br /> APPENDICES <br /> Appendix A Sampling and Analysis Plan <br /> Appendix B Quality Assurance Project Plan <br /> Appendix C Health and Safety Plan <br /> William DePaoli Property 1 <br /> Additional Groundwater Investigation Work Plan <br /> June 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.