My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS_CASE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEBER
>
936
>
2900 - Site Mitigation Program
>
PR0507178
>
WORK PLANS_CASE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/25/2021 3:13:28 PM
Creation date
5/20/2021 5:06:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
FileName_PostFix
CASE 2
RECORD_ID
PR0507178
PE
2950
FACILITY_ID
FA0007729
FACILITY_NAME
STOCKTON MULTMODAL
STREET_NUMBER
936
Direction
E
STREET_NAME
WEBER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
936 E WEBER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
encountered (depth to groundwater in this area is assumed to be approximately 20- <br /> feet). In addition a soil sample will be collected from near surface soils to perform a <br /> Resist.iviry "R"-value determination for Parcels 5 and 6. A single soil sample will <br /> be collected and tested for R-value using Cal-Trans Test 301. 'TR-value testing <br /> results will be used in the parking lot design proposed for those areas <br /> It should be noted the exploratory drilling through former excavations,or areas <br /> where buried objects have been located can create difficult drilling conditions, <br /> including auger refusal to advance at an additional cost to the Commission. Should <br /> it become apparent in the field that boreholes cannot be advanced through the <br /> excavations,identified areas. The boreholes will be located as close as possible to <br /> the original drilling target,and the sampling performed at that point. <br /> Cuttings from the borings and rinse water will be drummed and labeled for storage <br /> on the site until their content is known and the soil can be properly handled. <br /> Disposal of cuttings and rinse water is not included in this scope of work. The soil <br /> borings will be grouted following the requirements of the PHS/EHD. <br /> Exploratory Boring Locations and Purposes <br /> Parol No. & Esplorstory Boring Putpoze and Dsptb Chetalealh'hysical Analyses <br /> parcel 1,1 Hand Auger to 10' Investigate anomaly Pm <br /> Parcel 1, 1 Borehole to 20' Pons.o&situ contamination TPHO,T PHD <br /> Parcel 2,2 Had Auger to 10' Investigate anomaly PID <br /> Parcel S Borehole to 20Former UST,"R"value Min 2 for TPH4.TPHD; <br /> highest for BTFX <br /> Cal-Trans Test 301 <br /> Parcel S.2 Hand Auger to 10' Investigate anomaly PID <br /> Parcel S.3 Boreholes to 20' Former baacry storage IPA 8240,8270,CAM 17 <br /> Parcel 6, l Borehole to is, "R"value;radar anomaly Cal-Trans Test 301;TRPH, <br /> selected metals <br /> Chemical Analytical Methods <br /> Ste--:ed soil samples from the parcel will be analyzed as noted in the table above <br /> for ToW P_--oleam Hydrocwtons (17T, as gasoline and diestl ('17HG,TPI-M) <br /> using E_-'�A Nie'ttod 301_J_NL The soil sample wish the lughesr TPH conc==ad= <br /> will Ce analyzed *cr Benzene.Toluene, E:hyibeaz=c and icW Xylenes using FPA <br /> Mcthcd SO-M. A sings soil sample from aach buena on Parcel S will be analyzed <br /> for vclarEe and semi-volatile organics using E'A 1�Ie:hcd 3240 and 32-70 and C.kti1 <br /> 17 NfetaIs. All sampics will be analyzed on a Standard Ttzm=uad <br /> Reports <br /> ct•mmar�inte!.ffi:e:te;,e_or,will be pre^ared ;ollcwing the rec_irt of t c <br /> laborltory resits anri . ;i mm r»=c the conditions enceuntemd in the field. The <br /> s.j-r=ar-, leiter will include =omraepdadcns on whether to procs--d with the final <br /> rcper , {iir-.he,-!valuation of ccnt3minated soil. or both. <br /> A technical renart will be pre�artd dcc-mnenting the Phase II Ha`_rdcus materials <br /> -4s5es3:;1C= Tae Phase II re_cr x+411 :t:c`Lde a';sc.:ssicn er the in-m- ,U-sLcn <br /> findings, labor iorl test results_ conclusions and creliminary recotutnendazoas for <br /> Pip 3 <br /> E0 39a -1V1H3wr106I1%H3 1H9ItJM 90:bT L66T/90/OT <br />
The URL can be used to link to this page
Your browser does not support the video tag.