Laserfiche WebLink
Erosion Cut <br /> Vegetative Layer <br /> (Thickness varies, 12"to 24) <br /> Veg Layer Material <br /> In Erosion"Cut" <br /> Clay Barrier Layer Erosion Into Clay Barrier <br /> (12"Thick) <br /> 2"to 4" <br /> Foundation Soil <br /> EXISTING CONDITION <br /> Remove Veg Layer Material <br /> to Expose Clay Barrier <br /> (approx 2 ft on both sides)Prior to Placing GCL <br /> Reseed Surface Compact Veg Layer Material <br /> Vegetative Layer <br /> (Thickness varies, Nail GCL to <br /> 12"to 24") excavation wall <br /> 6" in Do not nail at base <br /> Install GCL in Contact <br /> Clay Barrier Layer w/ Exist Clay Barrier <br /> (12"Thick) <br /> Foundation Soil <br /> FINAL CONDITION <br /> FIGURE 2: CLOSURE CAP REPAIR <br /> Harney Lane Landfill, June 2004 <br />