My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2021
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
1427
>
2300 - Underground Storage Tank Program
>
PR0521942
>
COMPLIANCE INFO_2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2022 9:49:50 AM
Creation date
5/24/2021 10:32:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2021
RECORD_ID
PR0521942
PE
2371
FACILITY_ID
FA0014921
FACILITY_NAME
RANCHO SAN MIGUEL MARKET*
STREET_NUMBER
1427
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
16902016
CURRENT_STATUS
01
SITE_LOCATION
1427 S AIRPORT WAY
P_LOCATION
02
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br />Monitoring System Certification Form <br />18. IN -TANK GAUGING TESTING <br />U Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if NO tank gauging equipment is installed. <br />Do not complete this section if either box is checked. <br />Yes <br />No <br />NA <br />All wiring has been: 1) visually inspected for kinks, breaks and proper entry and <br />termination; and 2 tested for ground faults? <br />❑ <br />❑ <br />❑ <br />Were all in -tank gauging probes visually inspected for damage and residue buildup <br />to ensure that floats move freely, functionally tested, and confirmed operational? <br />❑ <br />❑ <br />❑ <br />Was accuracy of system's product level readings tested? <br />❑ <br />❑ <br />❑ <br />Was accuracy of system's water level readings tested? <br />❑ <br />❑ <br />❑ <br />Were all probes reinstalled properly? <br />❑ <br />❑ <br />❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />1 ❑ <br />1 ❑ <br />1 ❑ <br />Probe ID <br />Probe Model <br />Tanks Monitored <br />Pass <br />Fail <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />❑ <br />9. COMMENTS <br />Describe all answers marked "No" or "Fail" and proposed remedy. <br />List all monitoring equipment either replaced or repaired. <br />Removed Liquid from 87 Fill and STP Sumps. <br />Removed Liquid from 91 Fill Sump. <br />Vapor Return Line Boot was Pulled Back in 87 Fill Sump. <br />Estops - Tested & Passed. <br />Shear Valves - Tested & Passed. <br />Replaced TLS Battery for PM Purpose. <br />Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.