Laserfiche WebLink
RADUMI <br /> LOG OF PAGE No: <br /> I NTERNATIONAL BORING SB-7 1 OF 1 7 <br /> PROJECT: VERNALIS DRILLING CO.: GREGG DRILLING &TESTING <br /> --------------- <br /> LOCATION: ROBERTS DRILLING EQUIP.: GEOPROBE SAMPLING RIG <br /> PROJECT No.: 66516514.02 DRILLING METHOD: 2' PUSH ROD <br /> DATE/TIME STARTED: 07/14/98 BORING DEPTH: 27.5 FT. <br /> DATE/TIME FINISHED: 07/14/98 I GROUND SURFACE ELEVATION: <br /> LOGGED BY: JKG WATER LEVEL: NOT ENCOUNTERED <br /> F ¢ z o <br /> W <br /> W m } z <br /> U. C -i V a <br /> = a0 y a> W. �> s <br /> z 3 O s n. y <br /> W QC Qw Ca Q~ �0 ri <br /> Hcc as W3 0-i �H <br /> / GRAVELLY SILT(ML) <br /> pieces of brick (fill) <br /> CL SILTY CLAY (CL) <br /> slightly moist <br /> 6 R009 CL LIGHT OLIVE BROWN (2.5Y 5/4) SILTY CLAY (CL) <br /> dry <br /> j <br /> 10. R01 <br /> t5 R011 <br /> j <br /> 20 R012 <br /> ;j <br /> 25 R013 <br /> CL LIGHT OLIVE BROWN (2.5Y 5/6) SILTY CLAY (CL) <br /> R01 I refusal at 27.5 FT. <br /> 30 <br />