Laserfiche WebLink
BORING NO.: SB-24 SHEET 1 OF 3 <br /> AMEMW ®Science Applications PROJECT: Vernalis Pump Station <br /> From Science to solutions-International Corporation <br /> LOCATION: Vernalis,Stanislaus and San Joaquin Counties,California <br /> COORDINATES: N/A PROJECT NO.: 06-6102-00-8589-310 <br /> SURFACE ELEVATION: N/A DATUM: N/A LOGGED BY: Lee Ignatowicz <br /> z <br /> w o_ E a- > a p Z �> p m GEOLOGIC COMPLETION w <br /> Lu a a Q z_ Q � m o ° DESCRIPTION DETAIL w LL <br /> z cn to Z U W U cn <br /> Q <br /> HA SILT(ML):dark yellowish brown (10YR <br /> 0.0 SB-24 3/4);moist;soft;low plasticity;about Neat Cement <br /> @1, 85-95%silt,5-15%fine sand. <br /> 5 0.0 SB-24 <br /> @5' <br /> 10 0.0 SS <br /> 100 <br /> 15 0.0 SS <br /> 100 <br /> 20 0.0 SS <br /> 100 <br /> 0 <br /> N <br /> N <br /> o POORLY GRADED SAND WITH <br /> GRAVEL(SP):very dark grayish brown <br /> z (10YR 3/2);moist;medium dense;about <br /> w <br /> 25 0.0 SS 5%silt,80%sand,20%fine gravel. <br /> ° 100 <br /> 'a <br /> c� <br /> QI LEAN CLAY(CL):dark yellowish brown <br /> �i (10YR 3/4);moist;stiff;low plasticity; <br /> about 90%clay, 10%fine sand. <br /> J <br /> z <br /> Z <br /> w DRILLING CONTRACTOR: Gregg Drilling REMARKS: Utilities cleared to 8 feet below ground surface using hand auger. <br /> DRILLING METHOD: Hollow Stem Auger Boring located on Bogetti property. <br /> z <br /> z <br /> w DRILLING EQUIPMENT: Marl M5T Rhino Rig <br /> Q <br /> o DRILLING STARTED: 5/20/05 1 ENDED:5/20/05 <br /> J <br />