Laserfiche WebLink
BORING NO.: SB-25 SHEET 1 OF 3 <br /> AMEMW ®Science Applications PROJECT: Vernalis Pump Station <br /> From Science to solutions-International Corporation <br /> LOCATION: Vernalis,Stanislaus and San Joaquin Counties,California <br /> COORDINATES: N/A PROJECT NO.: 06-6102-00-8589-310 <br /> SURFACE ELEVATION: N/A DATUM: N/A LOGGED BY: Will Slowik/Lee Ignatowicz <br /> z <br /> w o_ E a- > a p Z �> p m GEOLOGIC COMPLETION w <br /> Lu a Q Q z_ Q � m o ° DESCRIPTION DETAIL w LL <br /> z cn to Z U W U cn <br /> Q <br /> HA SILT(ML): brown (10YR 4/3);moist; <br /> SB-25 medium stiff;low plasticity;about 100% Neat Cement <br /> @1, silt. <br /> 5 SB-25 <br /> @5' <br /> 10 0.0 SS <br /> 100 <br /> 15 0.0 SS <br /> 100 <br /> 20 0.0 SS <br /> 100 <br /> 0 <br /> N <br /> N <br /> o SILTY SAND WITH GRAVEL(SM):dark <br /> M brown (10YR 3/3);moist;about 20%silt, <br /> z 65%fine sand, 15%fine gravel. <br /> z <br /> w 25 0.0 SS <br /> a <br /> ° 100 <br /> 'a <br /> c� <br /> of <br /> Y <br /> Q <br /> �I <br /> I <br /> J <br /> Q <br /> Z <br /> w DRILLING CONTRACTOR: Gregg Drilling REMARKS: Utilities cleared to 8 feet below ground surface using hand auger. <br /> DRILLING METHOD: Hollow Stem Auger Boring located on Bogetti property. <br /> z <br /> z <br /> w DRILLING EQUIPMENT: Marl M5T Rhino Rig <br /> Q <br /> o DRILLING STARTED: 5/18/05 1 ENDED:5/19/05 <br /> J <br />