Laserfiche WebLink
BORING NO.: SB-30 SHEET 1 OF 2 <br /> ®Science Applications PROJECT: Vernalis Pump Station <br /> From Science to somlons-International Corporation <br /> LOCATION: Vernalis,Stanislaus and San Joaquin Counties,California <br /> COORDINATES: N/A PROJECT NO.: 06-6102-00-8589-310 <br /> SURFACE ELEVATION: N/A DATUM: N/A LOGGED BY: Will Slowik <br /> r z <br /> J W J > a 0 z > >m GEOLOGIC COMPLETION o w <br /> w w a J 7i� 7i w r of D O �2i DESCRIPTION DETAIL > LL <br /> O LL Z�Z � z H m 0 IL O� r� J V <br /> z o — w <br /> HA SILT(ML):dark yellowish brown (10YR <br /> 4/4);moist;soft;low plasticity;about <br /> 5-10%clay,80-85%silt,5-10%sand. <br /> Neat Cement <br /> 5 0.0 <br /> SS <br /> 100 <br /> 10 0.0 SS <br /> 67 <br /> 15 0.0 SS <br /> 100 <br /> 20 0.0 SS <br /> 100 <br /> o SS <br /> SB-30—X <br /> o @23' 67 <br /> c? SS POORLY GRADED SAND WITH <br /> z GRAVEL(SP):brown (10YR 5/3);moist; <br /> W <br /> x25SS 67 loose;about 70%fine sand,30%gravel. <br /> a <br /> � Neat Cement <br /> 0 <br /> J 100 <br /> LEAN CLAY(CL):dark yellowish brown <br /> 0.0 (10YR 4/4);moist;stiff;low to medium <br /> o plasticity;trace sand and gravel. <br /> �I SS 0 POORLY GRADED SAND WITH <br /> w 0.0 GRAVEL(SP):brown (10YR 5/3);moist; <br /> loose:about 80° fine sand 20° ravel. <br /> J <br /> Q <br /> z <br /> W DRILLING CONTRACTOR: Gregg Drilling REMARKS: Utilities cleared to 8 feet below ground surface using hand auger. <br /> z DRILLING METHOD: Hollow Stem Auger Boring located on Bellini property on gravel surface. <br /> z <br /> w DRILLING EQUIPMENT: Marl M5T Rhino Rig <br /> a <br /> °o DRILLING STARTED: 5/16/05 1 ENDED:5/16/05 <br /> J <br />