Laserfiche WebLink
BORING NO.: SB-36 SHEET 1 OF 3 <br /> AMEMW ®Science Applications PROJECT: Vernalis Pump Station <br /> From Science to solutions-International Corporation <br /> LOCATION: Vernalis,Stanislaus and San Joaquin Counties,California <br /> COORDINATES: N/A PROJECT NO.: 06-6102-00-8589-310 <br /> SURFACE ELEVATION: N/A DATUM: N/A LOGGED BY: Will Slowik <br /> z <br /> w o_ E a- > a p Z �> p m GEOLOGIC COMPLETION w <br /> Lu a Q Q z_ Q � m o ° DESCRIPTION DETAIL w LL <br /> z cn to Z U W U cn <br /> Q <br /> HA SILT(ML):dark yellowish brown (10YR <br /> 4/6);moist;soft;low to no plasticity;about <br /> 80%silt, 10%clay, 10%sand. <br /> Neat Cement <br /> 5- <br /> 0.0 SS <br /> 100 <br /> 10 0.0 x <br /> SS <br /> x <br /> 0.0 100 <br /> 15 0.0 SS <br /> 100 <br /> 0.0 SS <br /> 100 <br /> 20 0.0 SS <br /> 100 <br /> 0.0 SS <br /> N <br /> N <br /> M <br /> SS 100 As above,trace fine gravel. <br /> z <br /> 25 67 GRAVELLY SILT WITH SAND(ML): <br /> w SS brown (10YR 5/3);dry;soft;about 60% <br /> 0 0.0 silt,40%sand and gravel. <br /> 100 <br /> SS <br /> of <br /> 100 <br /> SS <br /> z <br /> w DRILLING CONTRACTOR: Gregg Drilling REMARKS: Utilities cleared to 8 feet below ground surface using hand auger. <br /> DRILLING METHOD: Hollow Stem Auger Boring located near county line on Bellini property. <br /> z <br /> z <br /> w DRILLING EQUIPMENT: Marl M5T Rhino Rig <br /> Q <br /> o DRILLING STARTED: 5/16/05 1 ENDED:5/16/05 <br /> J <br />