Laserfiche WebLink
/9� <br /> Ms. Penny Fottrell GEOMATRIX <br /> Chevron Environmental Management Company <br /> February 12, 2003 <br /> Page 4 <br /> (USCS) as presented in the American Society of Testing and Materials (ASTM) Standard <br /> D2488-90. <br /> Geomatrix proposes to collect grab groundwater samples from all of the borings, at a four-foot <br /> sample interval selected between 35 and 60 feet bgs, which is within the interval where <br /> petroleum-impacted soil has been previously identified at the site. Additionally, a grab <br /> groundwater sample will be collected from boring SB-15 at a depth of 80 feet bgs. Ground- <br /> water samples will be collected by advancing a hydropunch tool through the center of the <br /> sonic drill casing ahead of the drilling apparatus, exposing a four foot screen, then using a dis- <br /> posable bailer to collect a sample. The sample will be decanted into 1-liter amber bottles and <br /> 40 milliliter acidified volatile organic analysis vials provided by the laboratory. Samples will <br /> be labeled, stored in ice-filled coolers, and delivered to a state-certified analytical laboratory <br /> under Geomatrix chain-of-custody procedures. <br /> Following sample collection, the borings will be backfilled with grout in accordance with San <br /> Joaquin County and Stanislaus County requirements. <br /> ANALYTICAL METHODS <br /> The soil samples collected will be analyzed for total petroleum hydrocarbons quantified as <br /> crude oil (TPHc) using Environmental Protection Agency(EPA)Method 8015 Modified; for <br /> benzene, toluene, ethylbenzene, and xylenes (BTEX) using EPA Method 8021; and for <br /> polynuclear aromatic hydrocarbons (PAHs) using by EPA Method 8270 SIM. <br /> Groundwater samples will be submitted for analysis of TPHd using Environmental Protection <br /> Agency(EPA) Method 8015 Modified; for BTEX using EPA Method 8021; and PAHs using <br /> EPA Method 8270 SIM. The laboratory will perform the TPHd analyses both with and with- <br /> out a silica gel preparation procedure prior to analysis (EPA Method 3630 Modified). <br /> REPORTING AND SCHEDULING <br /> Upon completion of field activities and receipt of laboratory analytical results, Geomatrix will <br /> prepare a report documenting field activities and summarizing analytical results for submittal <br /> to ChevronTexaco. The report will contain tables and figures summarizing recent and histori- <br /> cal data., <br /> Mobilization of the drill rig is estimated to occur approximately 2 weeks following approval <br /> to access the adjacent properties. After samples are collected, laboratory data will be avail- <br /> able and evaluated within 4 weeks. Four weeks following receipt of data a draft report will be <br /> available for ChevronTexaco. <br />