Laserfiche WebLink
Mr. M. Scott Mansholt—CEMC <br /> First Quarter 2006 Groundwater Monitoring and Sampling Report April 10,2006 <br /> Vernalis Pump Station Page 5 of 5 <br /> inadequately spiked. The sample results for MW-5 were not consistent with historical results for <br /> PAHs. Because the MS/MSD failed to meet the QC requirements, MW-5 was re-sampled on <br /> March 16, 2006, and another set of MS/MSD samples were collected. The March 16, 2006 <br /> MS/MSD results, lab control sample results, and surrogate recoveries met QC requirements. <br /> Because the MS/MSD QC requirements were not met during the January analysis, the March 16, <br /> 2006 results for MW-5 are reported instead. The laboratory considers the sample results <br /> acceptable and useable. <br /> CONCLUSIONS AND RECOMMENDATIONS <br /> Groundwater elevations from the site wells indicate that groundwater flow was to the east at an <br /> approximate gradient of 0.041 ft/ft during the first quarter of 2006. No dissolved-phase TPHg or <br /> BTEX appear to be present at the site. Dissolved-phase TPHd were detected in MW-2, MW-3, <br /> MW-4, MW-6, and MW-7 during the first quarter of 2006 at concentrations of 120, 930, 290, 95, <br /> and 480 �tg/L, respectively. Low concentrations of PAHs were detected in the samples from <br /> wells MW-6 (field duplicate only) and MW-7 and were below the PRGs for direct exposure to tap <br /> water. SPO has been observed in well MW-1 since 1998. <br /> SAIC recommends continued quarterly groundwater monitoring and sampling of wells MW-1 <br /> through MW-7. The absorbent sock in well MW-I will be monitored quarterly and replaced as <br /> necessary. When the petroleum sheen has been removed, SAIC recommends that well MW-1 be <br /> incorporated into the quarterly monitoring and sampling program. Due to the lack of water and <br /> poor sample quality in wells MW-1 through MW-4, SAIC recommends that these wells be <br /> destroyed and new wells installed with a more suitable screen interval. A work plan for this <br /> scope of work will be submitted to the RWQCB. <br /> CLOSING <br /> If you have any questions regarding this report, please call Chris Dennis at(916) 979-3866. <br /> Sincerely, <br /> SCIENCE APPLICATIONS INTERNATIONAL CORPORATION <br /> c4vv�//"� �� <br /> G <br /> St Zet e Villanueva Christopher B. Dennis, P.G. <br /> Staff Scientist Senior Geologist <br /> NAL <br /> Enclosures: ��� <br /> Figure 1: Site Vicinity Map O <br /> CHRISTOPHER <br /> Figure 2: Site Map with Monitoring Well Locations d B <br /> Figure 3: Potentiometric Surface Map—First Quarter 2006 DENNIS <br /> Figure 4: Petroleum Distribution in Groundwater First Quarter 2006 <br /> Table 1: Groundwater Elevation Data and SPO Thickness Measurements IV°'79 84 <br /> Table 2: Groundwater Analytical Results—THPd,TPHg, and BTEXQF CAS-tF� <br /> Table 3: Groundwater Analytical Results—PAHs <br /> Attachment A. Field Data Sheets Expires August 31 =7 <br /> Attachment B: Laboratory Analytical Report <br /> ...................... .............. . ................ ....... ......... ........... .. ...... . .. ... ..... ..... .... ... .... ....... . . ....... <br />