My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WELTY
>
35500
>
2900 - Site Mitigation Program
>
PR0508043
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2021 7:04:54 PM
Creation date
5/24/2021 11:28:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508043
PE
2960
FACILITY_ID
FA0007905
FACILITY_NAME
CHEVRON PIPELINES
STREET_NUMBER
35500
STREET_NAME
WELTY
STREET_TYPE
RD
City
VERNALIS
Zip
95385
APN
25526003
CURRENT_STATUS
01
SITE_LOCATION
35500 WELTY RD
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1915
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. M. Scott Mansholt—CEMC <br /> Second Quarter 2007 Groundwater Monitoring and Sampling Report July 24,2007 <br /> Vernalis Pump Station Page S of S <br /> values were estimated concentrations detected between the method detection limit and limit of <br /> quantitation. The associated primary samples did not have detectable PAHs. <br /> Based on current and historic groundwater sampling results for this site and the apparent size and <br /> stability of the TPHd groundwater plume, SAIC recommends reducing groundwater monitoring <br /> and sampling from quarterly to semi-annual events. <br /> CLOSING <br /> If you have any questions regarding this report, please call Tom Burns at(916) 979-3748. <br /> Sincerely, <br /> SCIENCE APPLICATIONS INTERNATIONAL CORPORATION <br /> CiO <br /> Thomas Hope om Burns, P.6. <br /> Project Scientist Senior Project Manager a TK 0 Wt A S <br /> B <br /> Enclosures e '' 44/r,8 <br /> Figure 1: Vicinity Map �, N o. 8053 <br /> • <br /> Figure 2: Site Map <br /> Figure 3: Potentiometric Surface Map—Second Quarter 2007 01C CALIFa�� <br /> Figure 4: Petroleum Distribution in Groundwater <br /> Table 1: Groundwater Elevation Data and SPO Thickness Measurements <br /> Table 2: Groundwater Analytical Results--TPHd, TPHg,BTEX, and MTBE <br /> Table 3: Groundwater Analytical Results—PAHs <br /> Attachment A. Field Data Sheets <br /> Attachment B: Data Usability Summary and Laboratory Analytical Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.