Laserfiche WebLink
PROJECT SITE: Vernalis GLOBAL ID#: SLO607749833 <br /> DAVE TIME1 -{ .. <br /> WELL# <br /> Water Level `s <br /> Meter/Serial#: S'2-S Depth to Water(ft): <br /> Water Quality �7 Water Column(ft): <br /> Meter/Serial#: ,L 9 a <br /> Purge-Sampling �p Tubing Type/Diameter(inches): <br /> PumpJSerial#: � I�© JOGS 3 <br /> Casing Diameter(Inches): 2— Tubing Length (ft): v 'f <br /> Total Depth (ft): S2_ 00 Sampling Rate(not to exceed 1.0 L/min): ® ` Ll <br /> pFi emp {°C) C nductty ty ORP.{mV)' {mgll)' <br /> p <br /> Purge Ra#e �T Slcm <br /> {Lltntn) <br /> STABILIZATIUN CRITERIA r <br /> Time � Depth to Water jArawslown ldrst:. <br /> {ft) To Exceed 0 33 ; 1 Q%ITtJs(rnrhen <br /> Feet ±'01:pH uniks 10% 3%uSlcm 10mV turbfdt �s greater :0 3 tnglL .'. <br /> r....than 40.NTUs . . ... .... _ <br /> 03S 39 . 10 0. Lq2 y l� �. f. Z7 <br /> 59 0, 6 2 202 S i , 7 y,2 <br /> �.L2 ��r 1 ,67 l zG 1I �Cf. � q.Z1 <br /> o &13 10 .- c- (a, G,� 19 ,4(7 . zg r -7 S 7 23 <br /> lc�50 39 , r0 .�0 1 � .5� Zg I � 3 72. 3 2z <br /> 0S ��"l , 1,10 0 , q2- z3 <br /> los (o 3'-1 , I0 & 69 19 "S6 I � 1 So 2 <br /> eS9 3�I l� <br /> d , 4 ( .72 19, 7 1.30 G1 � . 7 y. r� <br /> Total Purged " <br /> Tiime Sampled <br /> .. .. <br /> Comnaenttl. <br /> NOTES: Inlell <br /> to (11�( r <br /> cnel�and JA <br /> MS AlSc. <br /> Sampled By: l <br /> Date: <br /> Form QH <br /> A Checked , �%— Date: Q <br /> I Entered Into EIM By: Date' m <br /> i <br /> j EIM QA Checked By: Date:_ r <br /> 1.ORP and oo may not always be appropriate stabilization indicator parameters,and will depend on site specific conditions, <br /> i <br /> i <br />