Laserfiche WebLink
fnrr,Scicrrrc to Scrutr.s <br /> PROJECT SITE: GLOBAL ID M <br /> c <br /> WELL# DATE TIME 7 — <br /> ater Leve[ Depth to Water(ft): <br /> Me r/Serial#: <br /> WateNQuality <br /> Meial#: Water Column (ft): <br /> Purge-Sa ling <br /> Pump/Serial Tubing Type/Diameter(inches): <br /> Casing Diameter nches): Tubing Length(ft): <br /> Total Depth(ft): Sampling Rate(not to exceed 1.0 Umin): <br /> T <br /> Purge Rate errtp EoG) ConSJcmVtty <br /> RP{rtsY)' bit3tty(NTIJ) [ Q(rtiglL)'.' <br /> PR O Tur <br /> Depth to Water STABILIZATION CRITERIA <br /> Time E3raulydawnIot <br /> ( � ` Exceetl 4 331 D%NTt1s(when <br /> Feet 0 1 pN units 10°l° # %uSlct» t 14m turbidity 4s greater t 3 rngll. <br /> Total Purged: Time Sampled. <br /> Comments 7N. <br /> NOTES: rJOr C��� �✓� . <br /> Sampled Date: B O 7� <br /> Form QA Checked By: ��� — Date: 5 $ p <br /> Entered Into EIM By: Date: <br /> EIM QA Checked By: Date: <br /> 1 ORP and DO may not always be appropriate stabilization indicator parameters.and wilt depend on site spentic conditions. <br />