Laserfiche WebLink
m EGG MONITORING WELL DEVELOPMENT LOG <br /> Page of <br /> x <br /> U <br /> ¢ Sample ID <br /> a All measurements taken tfom; gTop of Casing ❑Protective Casing ❑Ground Level <br /> 3 QN, of Drilling Fluid Lost <br /> Well Number y Borehole Qiameler Minimum Gal. to be Purged <br /> [Jars Screen Length /0 Qeve ent Metho <br /> Time St End: Measured Depth (pre-development) r .3' <br /> m� Client Measured Depth (post- Purging Equipment <br /> N Protect TS' Static Water Level(tt.) *-*� Water Level Equipment _5D <br /> CV Ele A/ L <br /> Job Number Standing Water Column tt. <br /> � 9 � ) pH/EC Meter <br /> m <br /> Ln <br /> Installation[late One Well Volume(gal.) Turbidity Meter <br /> Y <br /> M Well Diameter�_ One Annulus Vol. (gal) Other <br /> Field Parameters Measureo <br /> Time Amount Comments Field <br /> a Purged EC pH rerrsp. Turbidity I].D. SAL. GPM Tech. <br /> a (gal) W.L. <br /> z <br /> ¢ d" I <br /> a � / <br /> W <br /> Z <br /> 4 4 <br /> to <br /> Q f <br /> r <br /> �i <br /> ea <br /> m <br /> m <br /> R <br /> � I <br /> I <br /> U FINAL FIELD PARAMETER MEASUREMENTS <br /> T_ <br />