Laserfiche WebLink
Michael Oliphant - 2 - 8 May 2012 <br /> HHSE - US Can-Welty Road, Verna._ <br /> Based on our review, Central Valley Water Board staff has the following comments: <br /> • Consistent with other OVP/TAOC sites, a Soil and Groundwater Management Plan (SGMP) <br /> needs to be submitted. <br /> • Central Valley Water Board staff concurs with the findings of the HHSE and related supporting <br /> documentation, and that the Site is a candidate for closure. A request for a No Further Action <br /> Required (NFAR) determination may be prepared. <br /> • Documentation to support a NFAR closure determination should be completed in accordance <br /> with California Regional Water Quality Control Board, Central Valley Region's 1.6 April 2004 <br /> update to Appendix A of the Tri-Regional Board Staff Recommendations for Preliminary <br /> Investigation and Evaluation of Underground Tank Sites - No Further Action Requests. Section <br /> 6.5 - NFAR for Cases Exceeding Water Quality Objectives should be followed for documenting <br /> Site conditions. <br /> By 1 October 2012, please submit the SGMP and documentation to support a request for NFAR <br /> determination. If you have any questions or comments, please contact Dean Hubbard at <br /> (559) 445-5179 or by email: dhubbardQwaterboards.ca.gov. <br /> SHELTON R. GRAY C. DEAN HUBBARD <br /> Senior Engineering Geologist Engineering Geologist <br /> P.G. No. 6357 <br /> cc: H n no , an oaquin ounty E <br /> W. Lee Hammond, Union Pacific Railroad, Omaha, NE <br /> Norm Hunter, Stockton <br /> Arnold and Doreen Bellini, Tracy <br /> Andy Rustan, Tracy <br /> Alfred Schaffer, Vernalis <br /> Michael Hurd, SAIC, Oakland <br />