Laserfiche WebLink
ChevronTexaco—Vernalis Pump Station, Vernalis, CA. Project No. 06-6102-00-6369-201 <br /> June 29, 2004 Page 7 of 7 <br /> The subsurface investigation report will include the following: <br /> • Description of drilling methods and boring logs; <br /> • Field notes; <br /> • Description of soil and groundwater sampling methods and procedures; <br /> • A summary of soil and groundwater analytical test results; <br /> • A site plan with new borings and well locations; <br /> • A tabulation of soil and groundwater data; and <br /> • Copies of the laboratory analytical results. <br /> SCHEDULE <br /> SAIC will begin the pennitting and administrative work 2 to 3 weeks after receiving a Notice to Proceed <br /> from ChevronTexaco. Fieldwork will proceed after obtaining all the necessary permits, agreements, and <br /> clearances described in the scope of work. <br />( SAIC appreciates the opportunity to submit this scope of work, and looks forward to your favorable kd <br /> consideration. Please call Todd Del Frate at 916-979-3741 if you have any questions, comments, or need <br /> to discuss this scope of work in more detail. <br /> Sincerely, <br /> SCIENCE APPLICATIONS INTERNATIONAL CORPORATION <br /> \ O <br /> qO TODD ANDREW �N <br /> - 9 fes' <br /> No.7r394 <br /> Lee Ignato cz T d Del Frat , RG 7394 OF CA��FOQ <br /> Project Ge scientist enior Proje t Manager <br /> Attachments: <br /> Table 1 —Proposed Boring Objectives <br /> Figure I —Site Vicinity Map <br /> Figure 2—Site Map with Proposed Soil Boring and Monitoring Well Locations <br /> Figure 3—Proposed Well Construction Details <br /> Appendix A—Regional Water Quality Control Board Letter Dated December 4, 2003 <br /> Appendix B—Selected Historical Soil and Groundwater Analytical Results -Tables <br />