Laserfiche WebLink
TABLE 1 <br /> PROPOSED BORING OBJECTIVES <br /> Vernalis Pump Station <br /> Vernalis, California <br /> Proposed Closest Proposed Proposed <br /> Primary Proposed Boring Proposed Target Maximum Proposed <br /> Boring Area of with Sample Depth Sample Depth' Depth HHRA <br /> ID Investigation (A• I•) Media (feet) (feet) (feet) Soil Samples <br /> SB-22 Site ASB-7 s/ggw 70 30 - 40 85 yes <br /> Area of affected groundwater (water) <br /> SB-23 Northeast of Highway 33 SB-18 s/ggw 70 46 - 50 85 yes <br /> Northeast of area of affected groundwater (45 - 67) <br /> SB-24 (MW-6) Northeast of Highway 33 SB-19 s/ggw 70 54 - 58 85 yes <br /> Northeast of area of affected soil (50 - 68) (well 45) <br /> SB-25 Northeast of Highway 33 SB-20 s/ggw 70 64 - 68 85 yes <br /> Northeast of area of affected soil (44 - 74) <br /> SB-26 At Highway 33 SB-21 s/ggw 70 54 - 58 85 no <br /> East of area of affected soil and groundwater (36 - 80) <br /> SB-27 At Highway 33 ASB-4 s/ggw 70 40 - 60 85 no <br /> East of area of affected soil and groundwater (8 -40) <br /> SB-28 At Highway 33 ASB-4 s/ggw 70 40 - 60 85 no <br /> East of area of affected groundwater (8 - 40) <br /> SB-29 At Highway 33 ASB-7 s/ggw 70 30 - 40 85 no <br /> East of area of affected groundwater (water) <br /> SB-30 Site SB-17 s/ggw 60 22 -26 85 no <br /> Northwest of area of affected soil and groundwater (17 - 30) <br /> SB-36 Site ASB-2 s/ggw 70 18 - 36 85 no <br /> West of area of affected soil and groundwater (7-43) <br /> Page 1 of 3 <br /> ME <br /> �' <br />