Laserfiche WebLink
Geological Technics Inc. Page 4 <br /> Work Plan <br /> Project Name: Olsen (Vernalis) <br /> Project No. 248.2 <br /> January 3, 1995 <br /> 4.0 SIGNATURE AND CERTIFICATION <br /> This project will be performed by Geological Technics Inc. in accordance with <br /> accepted geologic and hydrologic standards of the State of California accepted <br /> and in effect at the time of this investigation. Geological Technics Inc. is not <br /> responsible for undisclosed conditions. <br /> This work plan was prepared by: <br /> GEOLOGICAL TECHNICS INC. <br /> Richard L. Dawson, <br /> Geologist <br /> Raynold I. Kablanow II, Ph.D. <br /> Registered California Geologist #5234 <br /> Registered Environmental Assessor #901 <br /> Databank:GTl Does:J065:olsen(Vernalis):248-SCWP <br />