Laserfiche WebLink
iLt 8 Bei i i 5:to b 2-09-948-i232 Dib PERMS'S <br /> 07090461)?,d4t <br /> Dcoemp,m, i 82007 <br /> 1MMEDIATFLY FOLLOWING#COMPLE I-ION OF WORK PERMI-i TEL) HEREW, PES AT-f-r-E �iiALL FILL <br /> QUIT AND MAIL NONTICE OF COMPLETION PROVIDED RY GRAN!-OR. <br /> Pernnittep's atteritio-ri is directed to Section 6. ,FG ONTROL OF NIA f ERiAL,&", Or the State <br /> Standard Specifications Reference to Lngineer in the State Standard Specificaiioriis <br /> shal'i in'Giode State R-Zepirasentatri'e. <br /> Pe-rm,ittee is directed to Standard Specification section 7-1 All Preservation Of ProPef'-Y, <br /> and Business and Professions Code, Section 8771. HermitLee shaii physicaiiy inspect <br /> tt,e tArcrk site P-rd locate survew rnoriijrnents prior to work, commencement. Monuments <br /> shA be irefere nc-ed orrmset i� jr,,c0rdqncn with RI,-vsIness end professions Gone. <br /> Permitter-, shall fully conform to the requirements of the Caitrans statewido NPULS <br /> Stcrrr, 'Nater Permit, Order No, 99-06-DWO. NPUES No. CAS000003, adopted by <br /> the State Water Resn"irces Control Board on July IS. 1999. The Permittee shall <br /> aIs o conform to the requirem- cM- <br /> ts of the General NPDES Permit for construction <br /> ALUit= and any subsequent Genoral Perrnit in effect at the time of issuance of this <br /> si oc. <br /> ilate rmn, water, dj5Chargr,'zs ass 'sted with <br /> rcaairnzink Permift. 11.1-hese perm- s rec-L L 5 to <br /> Year-round construction Or Special event encro-aslnmeat at-,Uviii es. <br /> For aii projects of i acre (0.405 hal of irtore thc- Parrnklee shall develop, Implement, <br /> and maintain a Storm Water Pollution Prevention Pian (SWPFPj- and for projects less <br /> than 1 acre (0 406 ba) a Water Pollution Control Program (WPCP). Eij;-Jer th4D PfaV. <br /> or pro rain shall also conform to the requirements of the Caltrans Storm Water Quality <br /> Ha,ndboo k, Construction Contrawtoes Guide and Sneclications and Caitrans <br /> Specification Section 11-4-.GIG and subsequent revisions. <br /> Except when necessary, as determined by the State Representative, no <br /> construction equipment or personal vehicles shall operate or park within the travoloO <br /> way. <br /> Pavement aritting shall be done by a saw-cutting wiethod and said method Snail be <br /> a <br /> ,proved prnvedl by the State repro-sentative prior to the start of work. <br /> Traffic control shall be done in conformance with Martuali on Uridorm Traffic <br /> Cor;f.rol Devices 2006 California Supplement. <br /> lie rm.littee/contractor shall work with the State representative to riaquosl the <br /> necessary lane closure needed. Request shall be the week prior to the actual <br /> work. '71*he State representativo shall submit closura through the Lane Closure <br /> System (LCS) for TraffC. IIA-lanagement Center fTM- C) approval by Wednesday <br /> afternoon of the week prior. <br /> A!! Lane closures sh-911 be called in by either the contractor to the T MC when tie ciosure <br /> begfrizi (10-97), ends 110-9), or is cancelled (10-22). The TIVIC can be reached (24-1) <br /> at(209)94-8-7,556 or 7551. <br />