Laserfiche WebLink
== BORING NO.: SB-28 SHEET 1 OF 2 <br /> t--DG:99 <br /> MEEFr1I`® PROJECT: Vernalis Offsite <br /> From Science to Solutions <br /> LOCATION: Vernalis,California <br /> COORDINATES: PROJECT NO.: 06-6102-00-6313-121 <br /> SURFACE ELEVATION: DATUM: LOGGED BY: Andrew Smith <br /> W ❑ E _j > a o z w o m GEOLOGIC COMPLETION <br /> CL `t' a s J w } J Z O DESCRIPTION DETAIL <br /> ❑ � ZUz U) Z � mo w �U) <br /> Q o - <br /> HA ^ •` Top Soil(TOPSOIL): <br /> Silt with fine sand (ML): dark brown (7.5YR 3/3); <br /> 100 moist; medium stiff; no plasticity; no odor;feet below <br /> ground surface. <br /> 0.0 <br /> 5 SB-28-5 Color change to strong brown(7.5 YR,5/6) <br /> DP :: Silt (SM): yellowish brown (10YR 5/6); dry; firm; no <br /> plasticity;no odor. <br /> 10 0.2 80 <br /> DP <br /> 90 <br /> 15 <br /> DP <br /> 100 <br /> 20 DP <br /> 0.2 70 Silt with fine sand(ML):yellowish brown (10YR <br /> dry; firm; no plasticity; no odor; feet below ground <br /> DP surface. <br /> Poorly graded sand with gravel (SP): light brown <br /> 25 (7.5YR 6/3); dry; loose; no odor; 80%to 85% sand, <br /> 70 15%to 20%gravel. <br /> DP Poorly graded sand with silt and gravel(SP-SM):dark <br /> yellowish brown (10YR 4/4); moist; loose; no odor; <br /> 30 0.0 90 10%to 15%fines, 70%to 80%sand, 10%to 15% <br /> gravel. <br /> F 32.1 feet bgs <br /> M DP 1 <br /> 0 <br /> Z <br /> W <br /> 70 <br /> Q <br /> 0 <br /> 35 <br /> J <br /> a <br /> DP <br /> ui <br /> U) SB-28- 70 39 feet bgs <br /> 0 38 Q <br /> Cn <br /> J <br /> Q <br /> Z <br /> LE DRILLING CONTRACTOR: RSI REMARKS: Grab groundwater samples were collected through pre-packed well screen. Boring was <br /> o DRILLING METHOD: Direct Push properly abandoned according to requirements set by the drilling permits.Boring terminated at 44 feet below <br /> z ground surface. <br /> w DRILLING EQUIPMENT: GP 660ODP <br /> a <br /> °o DRILLING STARTED: 2/26/08 1 ENDED: 2/26/08 <br /> J <br />