Laserfiche WebLink
== BORING NO.: SB-31 SHEET 1 OF 2 <br /> t--DG:99 <br /> MEEFr1I`® PROJECT: Vernalis Offsite <br /> From Science to Solutions <br /> LOCATION: Vernalis,California <br /> COORDINATES: PROJECT NO.: 06-6102-00-6313-121 <br /> SURFACE ELEVATION: DATUM: LOGGED BY: Andrew Smith <br /> W ❑ E _j > a o z w o m GEOLOGIC COMPLETION <br /> CL `t' a s J w } J Z O DESCRIPTION DETAIL <br /> ❑ � ZUz U) Z � mo w �U) <br /> Q o - <br /> HA ^ •` Top soil(TOPSOIL): <br /> Silt with fine sand (ML): dark brown (10YR 3/3); <br /> 100 moist;soft; low plasticity; no odor;80%to 85%fines, <br /> 0.2 15%to 20%fine sand. <br /> 5 SB-31-5L Increasing moisture and good plasticity <br /> Silt (ML): dark yellowish brown (10YR 4/6); moist; <br /> firm;low plasticity;no odor;Trace plant roots. <br /> DP <br /> 10 90 <br /> 1.1 <br /> DP <br /> 1.5 80 <br /> 15 Color change to dark yellowish brown(10YR 4/6) <br /> DP <br /> 80 <br /> 2.0 <br /> Caliche <br /> 20 DP <br /> 80 <br /> 1.6 <br /> DP <br /> 25 Trace plant roots <br /> 90 <br /> DP <br /> Increasing moisture and plasticity <br /> 30 1.3 90 <br /> ---------------------- <br /> o Silt with fine sand(ML):yellowish brown (10YR 5/6); <br /> M DP moist;firm; low plasticity; no odor;90%to 95%fines, <br /> z 10%to 15%fine sand. <br /> w 1.1 100 <br /> 0 <br /> 35 <br /> DP 1 36.3 feet bgs <br /> Li~ 100 Increasing%fine sand(15%to 20%) <br /> LL 38.5 feet bgs <br /> LL <br /> 0 <br /> J <br /> Q <br /> Z <br /> w DRILLING CONTRACTOR: RSI REMARKS: Grab groundwater samples were collected through pre-packed well screen. Boring was <br /> o DRILLING METHOD: Direct Push properly abandoned according to requirements set by the drilling permits.Boring terminated at 44 feet below <br /> z I ground surface. <br /> w DRILLING EQUIPMENT: GP 660ODP <br /> a <br /> °o DRILLING STARTED: 2/25/08 1 ENDED: 2/26/08 <br /> J <br />